Laserfiche WebLink
Oversizing In areas where the excavations for soil corrections extend below the proposed <br />footing elevations, the excavations require oversizing. We recommend the perimeter of the <br />excavation be extended a foot outside the proposed footprint for every foot below footing <br />grade (1H:1V oversizing). The purpose of the oversizing is to provide lateral support of the <br />foundation. <br />Fill Material Fill required to attain site grades may consist of any debris -free, non -organic <br />mineral soil. Except, we recommend that fill or backfill placed in wet excavations or within 2 <br />feet of the groundwater table consist of granular soil (sand) with less than 5 percent passing <br />the number 200 sieve and at least 50 percent retained on the number 40 sieve. <br />The on -site soils appear to be generally suitable for reuse as structural fill or backfill. Soils that <br />will be used or reused as fill or backfill will could require some moisture conditioning <br />(wetting) to meet the recommend compaction levels. Clayey soils (SB-10 and SB-12) that will <br />be reused as fill or backfill will likely require significant drying to meet the recommend <br />compaction levels. Summer months are typically more favorable for drying wet soils. <br />Topsoil or soils that are black in color are not suitable for reuse as structural fill or backfill. <br />Backfilling We recommend any loose sands or soil disturbed during excavation activities be <br />surface compacted to increase their density and uniformity prior to placing additional fill <br />and/or footings. We recommend the exposed soil be surface compacted with a large self- <br />propelled vibratory compactor operating in vibratory mode. <br />We recommend that backfill placed to attain site grades be compacted to a minimum of 95 <br />percent of its standard Proctor density (ASTM D 698). Granular fill classified as SP or SP-SM <br />should be placed within 65 percent to 105 percent of its optimum moisture content as <br />determined by the standard Proctor. Other fill soils should be placed within 3 percentage <br />points above and 1 percentage point below its optimum moisture content as determined by <br />the standard Proctor. All fill should be placed in thin lifts and be compacted with a large self- <br />propelled vibratory compactor operating in vibratory mode. <br />Foundations We recommend the perimeter footings bear a minimum of 42 inches below the <br />exterior grade for frost protection. Interior footings may be placed immediately below the <br />slab provided construction does not occur during below freezing weather conditions. <br />Foundation elements in unheated areas should bear at least 5 feet below exterior grade for <br />frost protection. <br />We anticipate the foundations and floor slabs will bear on compacted engineered fill (sand <br />fill) or native alluvial sand soils. With the building pad prepared as recommended, it is our <br />opinion the footings can be designed for a net allowable bearing pressure up to 2,000 pounds <br />per square foot (psf). <br />We anticipate total and differential settlement of the foundations will be less than 1 inch and <br />1/2 inch, respectively, across a 30-foot span. <br />8 <br />