Laserfiche WebLink
[';mergency Apparatus was out on March 13th and had numerous write ups. Officer Weiss <br /> and the City Mechanic will do the repairs. Firefighters Block and Fossum will go through the <br /> trucks rather than having Emergency Apparatus out to do it. <br /> <br />· Pump valves were replaced on Tanker #2 and Engine #1 and #2. <br /> <br /> [~ump heaters have been shut off. Pumps should be drained all the time, this should help with <br /> their maintenance. <br /> <br />o Grass trucks are ready to go. There is not a production date yet on Grass #2. <br /> <br />· On Monday Tanker #2 was found with 3 or 4 doors shut but not latched. <br /> <br />/iA l)I05,7PA GER,SVSCBA <br /> <br />(',hicF 1,(aplcr reviewed the Radios/Pagers/SCBA Report. <br /> <br />· ~l'hcre are no issues with the pagers. <br /> <br />o New SCBA equipment is in, thank you to those who helped with the inventory. Officer <br /> Strcich is looking into how to label the equipment. Equipment will be put in service on June <br /> <br /> ()il was checked and added to the compressors at both stations. Filter was changed at Station <br /> tt2. <br /> <br />, l~ottlcs were checked and three bottles are out of service. <br /> <br />· ()t'15ccr Streich has been looking at 2 models of SCBA trailers. There is a $16,000 <br /> difference; however there are some unique features. <br /> <br />7 '~ JR NO UT GEA R/MA PS <br /> <br />()t'ficcr I,ewandowski reviewed the Turnout Gear Report. <br /> <br />o Iqrcfightcr McKusick's jacket and Firefighter Block's pants are out for alternations. <br /> <br />° l~cplacement suspenders will be coming. <br /> <br />~4],iI)1( ;/1L REP OR T <br /> <br />Officer Minear reviewed the Medical Report <br /> <br />o Thc back pack for Rescue #2 is here and will be set up the same as Rescue #1. <br /> <br />FIRE DEPARTMENT/APRIL % 2003 <br /> Page 2 of 5 <br /> <br /> <br />