My WebLink
|
Help
|
About
|
Sign Out
Home
11/08/00
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Fire Department
>
Minutes
>
2000
>
11/08/00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2025 1:42:39 PM
Creation date
9/9/2005 10:54:20 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Fire Department
Document Date
11/08/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEDICAL/SCB,4 <br /> <br />Officer Weiss reviewed the Medical/SCBA Report. <br /> <br />· The defibrillator was inspected and the battery changed. <br /> <br />· Supply stock and Allina have replaced medical supplies used at accident scenes in October. <br /> <br />· Officer Weiss received a bid for station #2 defibrillator. <br /> <br /> Tanker One had a SCBA half full. It has been filled and put back into service.. Officer Weiss <br /> will monitor it for a leak. <br /> <br />· Officer Weiss is in the process of obtaining bids for a cascade system that would be at station <br /> #2. <br /> <br />· One six inch de-handled pipe pole has been ordered. <br /> <br />STATION CLEANUP <br /> <br />· Firefighter Dahlberg's group has station clean up this month. Officer Sharp reviewed what <br /> the group has done. <br /> <br />SAFETY CONCERNS <br /> <br />· Winter driving reminder, drive carefully, both on the way to the station and on the way to the <br /> scene. <br /> <br />° .lake breaks are off on the vehicles. <br /> <br />ANNUAL PHYSICALS <br /> <br /> Annual physicals will take place November 294 both in the morning and evening. Let Chief <br /> Kapler know if you are not able to make it that day and a second day will be scheduled. <br /> <br />STATION #2 UPDATE <br /> <br />· Thc weather has delayed completion of the metal roof, now snow needs to melt off before <br /> crews can finish. <br /> <br />· The inside schedule will depend on the metal roof completion. <br /> <br />· The contractor is asking for a six-week extension. City Council would not accept the request. <br /> <br />FIRE DEPARTMENT/NOVEMBER 8, 2000 <br /> Page 3 of 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.