My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/27/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 09/27/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:56:37 PM
Creation date
9/23/2005 2:38:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/27/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l'atrick ']']'udgcon <br /> ,%cptcmbt~]' 13, 2005 <br /> l'agc 2 <br /> <br /> Calculations must be snbmitted along with a grading and erosion control plan that delineates the <br /> d['aim~gc areas for this development. The post-developed rate of discharge shall not exceed the pre- <br /> developed rate rtlnoff ['or the 10-year critical design storm. An engineering plan review fee will app'ly <br /> - <br /> to this project estimated at $150.00 (if CSAH 116 turn lane construction is warranted in conjUnction <br /> with this development, the engineering plan review fee will increase as applicable). Please submit tlie <br /> drainage calculations, grading and erosion control plan, and the applicable engineering plan review fee <br />.to Andrew Witter, Construction Engineer, for his review and approval. <br /> <br />11' any work is to be performed within the county right of way, a permit is required and must be <br />obtained prior to the commencement of constructio~ (permit to work within R~V=$110.00-). Licep,.s~ <br />l'ermit Bonding, methods of construction, design details, work zone traffic control, restoration <br />requirements and follow-up inspections are typic'al elements of the permitting process. Contact Terri <br />K lein, Permit Technician, for further information regarding the permit process. <br /> <br />Thanl< you [br the opportunity to comment. Feel free to contact me if you have any questions <br />regarding this review. <br /> <br />Sincerely, <br /> <br />.lane K, Rose <br />'['ral'lSc Engineering Manager <br /> <br />xc~ <br /> <br />CSAt-I 116/PLATS/2005 <br />Randy Bettinger, Traffic Engineering Coordinator <br />.Iosic Scott, Traffic Engineering Technician <br />Tcrri Klein, Permit Technician <br />Mike Kelly, Chief Right Of Way Agent <br />Larry l-ioiutn, County Surveyor <br />Andrew Witter, Construction Engineer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.