Laserfiche WebLink
Oversizing In areas where the excavations for soil corrections extend below the proposed <br /> footing elevations, the excavations require oversizing. We recommend the perimeter of the <br /> excavation be extended a foot outside the proposed footprint for every foot below footing <br /> grade (1H:1V oversizing). The purpose of the oversizing is to provide lateral support of the <br /> foundation. <br /> Fill Material Fill required to attain site grades may consist of any debris-free, non-organic <br /> mineral soil. Except,we recommend that fill or backfill placed in wet excavations or within 2 <br /> feet of the groundwater table consist of granular soil (sand) with less than 5 percent passing <br /> the number 200 sieve and at least 50 percent retained on the number 40 sieve. <br /> The on-site soils appear to be generally suitable for reuse as structural fill or backfill. Soils that <br /> will be used or reused as fill or backfill will could require some moisture conditioning <br /> (wetting)to meet the recommend compaction levels. Clayey soils (SB-10 and SB-12)that will <br /> be reused as fill or backfill will likely require significant drying to meet the recommend <br /> compaction levels. Summer months are typically more favorable for drying wet soils. <br /> Topsoil or soils that are black in color are not suitable for reuse as structural fill or backfill. <br /> Backfilling We recommend any loose sands or soil disturbed during excavation activities be <br /> surface compacted to increase their density and uniformity prior to placing additional fill <br /> and/or footings. We recommend the exposed soil be surface compacted with a large self- <br /> propelled vibratory compactor operating in vibratory mode. <br /> We recommend that backfill placed to attain site grades be compacted to a minimum of 95 <br /> percent of its standard Proctor density (ASTM D 698). Granular fill classified as SP or SP-SM <br /> should be placed within 65 percent to 105 percent of its optimum moisture content as <br /> determined by the standard Proctor. Other fill soils should be placed within 3 percentage <br /> points above and 1 percentage point below its optimum moisture content as determined by <br /> the standard Proctor. All fill should be placed in thin lifts and be compacted with a large self- <br /> propelled vibratory compactor operating in vibratory mode. <br /> Foundations We recommend the perimeter footings bear a minimum of 42 inches below the <br /> exterior grade for frost protection. Interior footings may be placed immediately below the <br /> slab provided construction does not occur during below freezing weather conditions. <br /> Foundation elements in unheated areas should bear at least 5 feet below exterior grade for <br /> frost protection. <br /> We anticipate the foundations and floor slabs will bear on compacted engineered fill (sand <br /> fill) or native alluvial sand soils. With the building pad prepared as recommended,it is our <br /> opinion the footings can be designed for a net allowable bearing pressure up to 2,000 pounds <br /> per square foot (pso. <br /> We anticipate total and differential settlement of the foundations will be less than 1 inch and <br /> 1/2 inch,respectively, across a 30-foot span. <br /> 8 <br />