My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/10/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 05/10/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:30:25 PM
Creation date
5/10/2022 11:46:39 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/10/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gutter in the project area was found to generally be in good condition, and only spot repairs are proposed. <br /> Minor repairs to the existing storm sewer structures are proposed with this project,the majority of which are <br /> grouting the existing adjustment rings and pipe inverts. Some storm sewer catch basin castings will require <br /> resetting due to settling. <br /> The City will be placing inflow and infiltration barriers on the sanitary sewer manholes with this project. The City <br /> received an MCES I/I Grant for this work,which will reimburse the City for the costs associated with the I/I <br /> barriers. <br /> Construction Process <br /> •Install traffic control measures <br /> o Traffic control devices are maintained throughout the project <br /> •Project removals (spot curb and gutter,pedestrian ramps) <br /> •Place new concrete curb and gutter and pedestrian ramps (add 5 to 7-day cure time) <br /> •Mill 1.5 to 2-inches off existing pavement surface <br /> •Adjust and repair storm sewer catch basins <br /> •Install I/I devices in sanitary sewer manholes <br /> •Restore the boulevard in any impacted areas <br /> o 4 inches topsoil,turf <br /> •Place new bituminous pavement <br /> o Remove traffic control measures as allowed <br /> Preliminary Schedule Remaining <br /> •Council Awards Contract to the lowest responsible bidder <br /> o May 10, 2022 <br /> •Contractor begins construction <br /> o June 2022 <br /> •Contractor substantially completes construction <br /> o September 2, 2022 <br /> •Contractor completes construction(project cleanup,punch list created) <br /> o September 30,2022 <br /> Notification: <br /> Advertisements were published in the Anoka County Union Herald and in Finance& Commerce on April 1 and <br /> April 8, 2022. Bids were also advertised on-line on Quest CDN. <br /> Letters will be mailed to property owners with updates on the project status, contact information, and project <br /> webpage information. Engineering Staff maintains a project webpage,which will be updated as new information is <br /> made available throughout the project. <br /> Time Frame/Observations/Alternatives: <br /> Alternative#1 -Motion to adopt Resolution#22-103 accepting bids and awarding a construction contract for 2022 <br /> Neighborhood Pavement Overlays, Improvement Project#22-04, to North Valley, Inc. in the amount of <br /> $732,929.10. <br /> Alternative#2—Motion to deny adoption of Resolution#22-103 at this time. <br /> Funding Source: <br /> Bids were advertised in the Anoka County Union Herald and in Finance and Commerce on April 1 and April 8, <br /> 2022. On May 2,2022, a total of six(6)bids were received, opened, and tabulated, and the following bids were <br /> found to comply with the advertisement for bids. <br /> CONTRACTOR TOTAL BID <br />
The URL can be used to link to this page
Your browser does not support the video tag.