Laserfiche WebLink
Preliminary, Pint and Prelimina~7 Site Plan Review: Ramsey Town Center' 12th Addition <br />October 28, 2005 <br />Page 6 of 6 <br />25. Mailbox Location: The placement of mailboxes for the townhome un/ts should be located <br /> along the private streets when possible. Location of mailboxes along public streets will need <br /> to be clustered and is subject to the review and approval of the Streets Supervisor. <br /> <br />26. <br /> <br />Address Signage: The City will be requiring an address location'sign (specifying the units <br />addresses) to be placed at the entrance of all private streets. The required signage will assist <br />emergency services in locating a specific unit when called to the site. In order to assist Staff <br />in review of the placement of signs and to ensure an orderly look of the site, please revise the <br />signage and striping plan to show address signs. The address sig-nage is subject to the review <br />and approval of the City Engineer and Police Chief. it should be noted that signs identifying <br />the development will require a separate sign permit. <br /> <br />27. REU Number: The City has enacted a quarterly drainage utility charge. The charge for <br /> townhomes is the same as for single family residences and is currently $6.30/quarter. <br /> <br />The Planning Commission will be meeting at 7:00 p.m. on Thursday, November 3, 2005 at the <br />Ramsey Fire Station No. 1, 15050 Armstrong Blvd. NW, to review your preliminary plat and site <br />plan. A copy of the case cover sheet is enclosed. If you have any questions or need additional~ <br />information, please don't hesitate to contact me. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Sylvia Frolik <br />Asst. Community Development Director <br /> <br />Civil Engineer II <br /> <br />CCi <br /> <br />Jeffrey Schrock <br />URS <br />Thresher Square, SUite #600 <br />700' Third Street South <br />Minneapolis, ~'4 55415 <br /> <br />146 <br /> <br /> <br />