Laserfiche WebLink
Preliminary, Plat and Preliminary Site Plan Review~ RamSey Town Center 12th Addition <br />November 23, 2005 <br />Page 3 of 7 <br /> <br />Grading and Drainage: Staff has received a graaing and drainage plan for the <br />development and has the following comments'. Stormwater calculations must be submitted <br />to the City, and Lower Rum River Water Management Organization for verification of <br />conformance with the master drainage plan. The rock construction entrance on the <br />Stormwater Pollution Prevention Program (SWPPP) should be replaced with the <br />requirement for daily sweeping of adjacent streets during active, construction and as <br />required by the city. ~. <br /> <br />A SWPPP is required for this project. It must reference the SWPPP prepared for the Ramsey <br />Town Center Project and provide for transfer of responsibility from RTC, LLC to this <br />developer and contractor. <br /> <br />The grading plan shows proposed retaining walls along the non-garage sides of the buildings. <br />This will provide level areas adjacent to the buildings that can be used by the residents. <br />There are areas where the grade slopes away from the building at a 4:1 slope down to the' <br />street. Raising the retaining wall height may provide more level area adjacent to the building. <br />The plans show sidewalks from internal street to the trail along Bunker Lake Boulevard. <br />These sidewalks ail have steps. Please investigate providing one (I) accessible route with out <br />steps between I47t~ Terrace and Bunker Lake Boulevard. <br /> <br />The proposed plan-indicates some of the buildings will have up to 6 feet of foundation <br />exposed below the first floor. Taller plantings must be provided in these areas as noted in the <br />landscaping comments below. <br /> <br />The "For Reference Only" note on all sheets should be moved'to the fight side of the sheet. <br /> <br />10. Utilities: This subdivision will be served by sanitary sewer and city water services that will <br /> be extended into the development. The utilities' are stubbed to. the lots from the previous <br /> development. <br /> <br />The invert elevations of the proposed building services must be shown on the plans. The <br />vertical separation between the water and sanitary sewer services must be 18". Installation o~' <br />one water service per building precludes conversion of the units to townhomes in the future. <br />The main water meter must be in an accessible space, not in an individual unit. <br /> <br />Water, Sanitary Sewer and Storm Sewer will need to be extended from south of Bunker Lake <br />Boulevard to serve this project. The proposed points of location shown on' these plm~s <br />assume construction of RTC 8th addition, additional plans will be required if RTC 8th <br />addition is not constructed prior to this project. The utilities south of Bunker Lake Boulevard <br />were included in the proposed assessments of the Master Development Agreement tbr <br />Ramsey Town Center. Construction of the utilities must be coordinated with the city and <br />conform to the assessment process. Assessments are addressed later in this letter. <br /> <br />14 <br /> <br /> <br />