Laserfiche WebLink
ENGINEER'S ESTIMATE - OPTION 1: BIKE LANES <br />WATERMAIN <br />QUANTITY AMOUNT <br />STORM SEWER <br />QUANTITY AMOUNT <br />BIKE LANES <br />QUANTITY AMOUNT <br />$22,425.00 <br />00'00S'OT$ <br />ROADWAY <br />QUANTITY AMOUNT <br />1 $500.00 <br />ENGINEER'S ESTIMATE <br />MnDOT TOTAL ESTIMATED TOTAL <br />ITEM NO. SPEC NO. ITEM NOTES QUANTITY UNIT UNIT PRICE AMOUNT <br />39 2575.505 SEEDING 1 ACRE $500.00 $500.00 <br />))\\\} <br />SEED MIXTURE 25-121 <br />HYDRAULIC BONDED FIBER MATRIX <br />4" SOLID LINE MULTI COMP <br />24" SOLID LINE MULTI COMP <br />4" DOUBLE SOLID LINE MULTI COMP <br />PAVEMENT MESSAGE MULTI COMP <br />ESTIMATED CONTRUCTION TOTAL: <br />$1,228,546.00 <br />INCLUDES TOPSOIL STRIPPING AND STOCKPILING <br />