My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 01/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:08 AM
Creation date
1/12/2023 3:59:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER'S ESTIMATE - OPTION 2: NORTH SHARED USE PATH <br />WATERMAIN <br />QUANTITY AMOUNT <br />STORM SEWER <br />QUANTITY AMOUNT <br />SHARED USE PATH <br />QUANTITY AMOUNT <br />200 $12,000.00 <br />I00'00L$ <br />ROADWAY <br />QUANTITY AMOUNT <br />ENGINEER'S ESTIMATE <br />MnDOT TOTAL ESTIMATED TOTAL <br />ITEM NO. SPEC NO. ITEM NOTES QUANTITY UNIT UNIT PRICE AMOUNT <br />38 2531.618 TRUNCATED DOMES 200 SQ FT $60.00 $12,000.00 <br />\,!LULU==ya,<22===, <br />/j<<ZZ-'/§))//// <br />2,000 <br />525 <br />100 <br />TRAFFIC CONTROL <br />SIGN PANELS TYPE C <br />STABILIZED CONSTRUCTION EXIT <br />STORM DRAIN INLET PROTECTION <br />CULVERT END CONTROLS <br />SILT FENCE, TYPE MS <br />SEDIMENT CONTROL LOG TYPE WOOD FIBER <br />FERTILIZER TYPE 3 <br />COMMON TOPSOIL BORROW <br />ROLLED EROSION PREVENTION CATEGORY 20 <br />SEEDING <br />SEED MIXTURE 25-121 <br />HYDRAULIC BONDED FIBER MATRIX <br />4" SOLID LINE MULTI COMP <br />24" SOLID LINE MULTI COMP <br />4" DOUBLE SOLID LINE MULTI COMP <br />PAVEMENT MESSAGE MULTI COMP <br />,,,,,,,,,,,: <br />LT; <br />LT, <br />::: <br />ESTIMATED CONTRUCTION TOTAL: $1,724,975.00 <br />10% CONSTRUCTION CONTINGENCY: <br />TOTAL ESTIMATED CONSTRUCTION COST: $1,897,472.50 <br />% <br />INCLUDES TOPSOIL STRIPPING AND STOCKPILING <br />STOCKPILE LOCATION: PUBLIC WORKS, 14199 JASPER STREET NW. CONTRACTOR SHALL USE ALL AVAILABLE STOCKPILE MATERIAL BEFORE IMPORTING AGGREGATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.