My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 02/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:22 AM
Creation date
2/16/2023 4:32:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
911111110 <br />For this study, the Metropolitan Council Regional Activity Based Model (ABM) was used to estimate <br />travel demand and to develop future year daily traffic forecasts. <br />iiu: IIII IIII1 q:iiu ul iiu cl IIII ,(:,1, IIII iiu iiu m 1; iiu mcl IIIV ,iiuec;a ..iii iiu°m IIII n: IIIV u„ �,c 1 I°IIII <br />f <br />The ABM was developed in 2016 to analyze travel demand and assist planning efforts throughout the <br />Twin Cities region. For this study, the ABM was reviewed to ensure roadway network and current <br />land use assumptions were incorporated. Existing conditions model validation was performed in the <br />study area. <br />Travel demand models provide an estimation of traffic forecasts that include many future year <br />assumptions. However, all travel demand models contain residual error and results should be <br />considered estimates with some margin of error. MnDOT currently considers long-range forecasts to <br />have a precision of +/-15 percent. Decision -makers and designers should be aware of the uncertainty <br />in long-range forecasts and whether that margin of error will affect outcomes of the recommended <br />improvements. <br />Travel ID aeornaulmd IM odaeIII Assuilllumlll l liioio s <br />Existing and future year socioeconomic (SE) development and roadway network assumptions were <br />included in the ABM. <br />Socioeconomic Data <br />The development assumptions that were incorporated into the AB1M1 and used for the CSAH 5 traffic <br />study are shown in Table 6. The municipal totals are consistent with the Metropolitan Council's Mire <br />AISP 2040. <br />Table 6: CS, IH 5 Stuy , reaa Development , ssuriptiiorns <br />Year 2018 Year 2040 <br />Municipality <br />Population Households Employment Population Households Employment <br />Andover 32.61.0 1.0,532 5,864 9,8(J 1.. ,500 7,1..00 <br />Anoka 1..852... 7,.544 14.593 2.l..„..00 8,900 14.400 <br />Elk IR=Rivc'r 24891 8 6!58 1..1.... 3 26,900 900 1..1 00 <br />INowthcii 4.703 1...51..8 9 i 5,500 2..1.00 680 <br />(Ramsey 26,.821. 9,.226 (,1.. 2. 3) 1..50 1:1500 8,400 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.