My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 03/21/2000
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2000 - 2009
>
2000
>
Minutes - Public Works Committee - 03/21/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 10:14:08 AM
Creation date
5/22/2003 10:30:06 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
03/21/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Hendriksen stated that the Committee had given direction to send out a letter to <br />the residents along Dysprosium informing them that the State is demanding that the speed humps <br />be removed or the street be removed from the MSA system which would require the City to pay <br />funds back to the State. <br /> <br />City Administrator Norman replied that there was some confusion at the Council level, which <br />made it unclear to staff as to what direction they should take. <br /> <br />Councilmember Hendriksen stated that the intent of the letter was to make the residents aware <br />that the City was fighting to keep the speed humps. <br /> <br />Councilmember Connolly stated that because of the proposed development along Dysprosium <br />Street it would not be an appropriate time to send the letter to the residents. <br /> <br />City Engineer Jankowski reviewed the proposed development explaining that the development <br />will not have a large impact on Dysprosium Street. <br /> <br />Councilmember Hendriksen inquired as to what would happen if Dysprosium Street was <br />removed from the MSA system. <br /> <br />City Engineer Jankowski replied that the City would have to pay back funds, but he was unclear <br />as to where they pay the funds back to. <br /> <br />Councilmember Hendriksen suggested putting together a five year plan that would remove <br />Dysprosium Street in 2005 from the MSA system. <br /> <br />Councilmember Connolly replied that the City still needs to do some traffic calming. <br /> <br />City Engineer Jankowski suggested bringing out the curb lines, adding sidewalks and increasing <br />the landscaping. <br /> <br />Councilmember Zimmerman stated that Dysprosium Street is an issue that needs further <br />discussion at the full City Council level. <br /> <br />Consensus was to leave the MSA plans as they are and direct staff to locate the additional 1.95 <br />miles and discuss the Dysprosium issue at a later date. <br /> <br />Case #4: Corridor Modifications to Introduce Right-of-Way Ordinance <br /> <br />City Engineer Jankowski stated that on January 25, 2000, the City introduced a right-of-way <br />ordinance that was drafted based upon a model ordinance developed by the League of Minnesota <br />Cities. Representatives from Connexus Energy requested that passage of this ordinance be <br />delayed to give City staff an opportunity to meet with Connexus to discuss concerns regarding <br />the ordinance. Mr. Jankowski met with representatives from Connexus, and several drafts <br /> <br />Public Works Committee/March 21, 2000 <br /> Page 5 of 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.