Laserfiche WebLink
-3- <br /> <br /> 19~0 sower service to [~e:rsey is expected to accommodate a sc~ered popula- <br /> tion of 6,000 and a domestic scwor,~g¢ flow of .57 i~IGD' <br /> Based on the above, Ramsey may wish to assume 1984 will be the date that <br /> metropollton sewer service will be inltially avai~ab~ at the western <br /> border of Anoka and through the second Ramsey connection. Growth staging <br /> initial service date. <br /> al trunk sewer phasing could be based o~thqs <br /> and ~oc ~ ~,~ <br />' ~he question of how much metropolitan sewe~c'~pac~ty will be available <br /> over time may still be a major concern to/the city. Design assumptionS* <br /> for the Anoka scgmen~ of the metropolitod sewer system which will serve <br /> Ramsey are based on ~ppro~,mate u~.~ flow for Rag]soy of ~ 95 V,~D at <br /> ~ ~ Jan and'~.4~)MGD at the Anova western boroer <br /> the second Ramsey connuc~ , .~ ..... ~ers indicate an ultimate resl <br /> ' n These capac~[y oes;gn~,--,~ <br /> conneCtlO - ' <br /> dential sewered population of 46,500 (~ lO0 gallons per person per day flow) <br /> . and industrial flow reflecting employment of 1,500. Ramsey may wish ~o <br /> . discuss use of ~.greater share of this uitlmate desig~ capacity than the <br /> 6,000 person, 1990 scwered population contained in-the 208 plan. IF this <br /> ' is the case, discussions between Lhe c tv and Metropolitan Council, and <br /> Metropolitan Waste Control Commission staff should be initiated now ~o <br /> define appropriate approaches for addressing th~s issue. <br />(*gcsiQn Review Repor~-Anoka Interceptor, Short, Elliot, Handrlckson, <br />March' ]97~) <br /> <br />C. Other sewer issues <br />A preliminary review of the Ramsey Comprehensive Sewer Plan by Metropolitan <br />Council ~nd r, WCC staff'has identified the following concerns which shoGld be <br />the subject of further discussion with the city. <br /> The design of the local collection system to provide for storage an~ off-peak <br /> pumping to allow future, long-term ~ervice ~o northern portions of Ramsey. <br /> I~ is felt that the collection system tha~ is initially provided shoulo be <br /> sized based on its ultimate service rune[ion. Stornge and off-peak pumping <br /> are normally used as remedial measures rather than being intentionally used <br /> as a deslgn so~ution. ~ /~K <br /> The 70 gallons per person per day flow assumptions- I~ is felt that f~ow <br /> should be increased to reflcct potential inflow/infiltration or tl~at an <br /> additional inFil~ration factor should be used in determining system s~zlng. <br /> In terms of the provision of initia1 metropolitan sewer service, more <br /> definite assurances s~ould be provided indicating close coordination between <br /> the installation of Ioca~ sewers a~cl the construction of the metropolitan <br /> system. In other words, the ~WCC does not want a sltua~ion where the <br /> metropolitan facility would be completed and there would b~ delays in local <br /> system construction which wou'l~ cause lack of use of the r~ctropolitan sys- <br /> tem for some LieUt. <br /> - ~l~ Ramsey is going to request interim service fr~m khe existin9 Anoka plant <br /> prior to the completion of the pern~anent metropolitan sec.;er service alter- <br /> native (CAB interceptor or expanded Anoka plant), dctc. i !s should be ~ro- <br /> vialed on the amount Of interim service that is needed. <br /> <br /> <br />