Laserfiche WebLink
Brookfield ?' Addition - Final Plat <br />March 9, 2006 <br />$ of 6 <br />Wetlands: A substantial portion of the property, is wetland, which has been delineated and <br />encumbered with drainage and utility easements on the final plat. It is noted that there are no <br />wetland buffers proposed on the final plans. Staff is suggesting that in lieu of the fact that <br />wetlands buffers were not a requirement at the time of preliminary plat review, that monuments <br />be placed at the limits of the wetland. And, like the wetland buffer ordinance, a 15-foot structure <br />setback should be implemented from the wetland limit. <br /> <br />Troll Brook Corridor: City. Staff is pursuing acquisition ora conservation e~sement along the <br />Troll Brook corridor. The acquisition is funded through the LCMR Grant. <br /> <br />Streets and Access: The proposal for the first phase of the development includes the <br />construction of Limonite Street N.W., 167~' Terrace N.W., Olivine Street N.W., and 170~h Trail <br />N.W., which complies with the preliminary plat, but results in only one access for this £zrst phase <br />of Brookfield until other phases come on line. The phasing of this final plat will result in all 49 <br />lots relying upon a single access point, 166m Aven~6. at Limonite street. Public safety requires <br />that a second outlet be provided for ~.ccess to these lots. Staff proposes that the number of <br />building permits for this addition be limited to 16 until a second paved ingress / egress is <br />provided, either through future phase additions or through a temporary paved connection. <br /> <br />Grading and Drainage Plans: A f'mal grading and drainage plan has been prepared for this <br />subdivision by Passe Engineering, Inc. Staff offers the following comments on this plan: <br /> 1. Elevations need to be provided on all lot comers and along the centertine of drainage <br /> swales which do not coincide with common property lines. Drainage and utility <br /> easements need to be provided over such swales and be shown on the grading plan. <br /> 2. The 100 year flood elevations for Troll Brook and the adjacent wetland need to be noted <br /> on the grading plan. Ail lowest floor building elevations must be two feet above this <br /> elevation. <br /> 3. The maximum slope should not exceed one foot vertical to four feet horizontal. The <br /> slopes on Pond B are one toot vertical to three feet horizontal. <br /> 4. The lot grading table should include the style of structure, the front yard slope, the rear <br /> yard slope, and a notation on which lots have yard grades less than 2% which will require <br /> a grading certificate prior to occupancy. <br /> 5. The tree preservation boundary should be added to the grading plan <br /> <br />A permit from the Lower Rum River Water Management Organization has been obtained. The <br />conditions of that permit must be met <br /> <br />Utilities: This subdivision will be served by municipal sanitary sewer and water service which <br />will be extended to the site via a separate contract. Service to this subdivision will be dependant <br />upon this contract and the development of the Sweet Bay Ridge subdivision. Certificates of <br />occupancy will not be issued until the City sanitary sewer and watermain are fully functional and <br />must include permanent vehicular access to the lift station. The current construction plans must <br />be amended to provide for such access. <br /> <br />-157- <br /> <br /> <br />