Laserfiche WebLink
Me~"O.'DOI ~c~ CctJr~cll <br />.",7.3 Metro Sc;u.']re :..uildm,.q <br />Se;,er',:r: Street e~d PoOert Slree, <br />S~:",t P3ul, Minnesota 55~,0; <br /> <br /> Teleph¢~e [612] 2~"1'6453 '---- <br /> Cfi[ce of TiLe Cha[rmcn ~ :- <br /> <br />November 11, 1980 <br /> <br />Mayor Thomas Gamec <br />City of R~,~sey <br />15153 Northern Blvd. <br />Ramsey, Minnesota 55303 <br /> <br />Dear Mayor: <br />I am writing th~s letter to you to help clear up some loose <br />ends concerning the CAB interceptor sewer and other matters <br />of mutual interest. <br />The need for a second Ramsey connection to the CAB came out ' <br />of the CAB study committee process. Our position since 1977 <br />has consistently been that until Ramsey submits a plan that <br />is reviewe~ by the Metropolitan Council, and in which the <br />need for and the tgm~ng of the second connection is docum.,ented, <br />the Counc$1 well not formally .set a timetable for'the connection. <br />This position was outlined in Council staff member Lee Starr'$ <br />memo which is attached. <br /> The memorandum suggests a target date of 1984 which, in our <br /> estimation, is the earliest date a facility could be put in <br /> place. Current 201 studies put the date at 1987 or later. <br /> These dates reflect Metropolitan need in the absence of a <br /> reviewed local comprehensive plan. The date ultimately <br /> established will be-based on' doc~mentated need. The comprehensive <br /> Sewer plan which was forwarded to the Council in 1978 was <br /> necessary to provide information on a probable design for the <br /> city's sewer system to be used in preparing plans and specifi- <br /> cations for the ~_noka segment. <br /> The extension cannot be programmed until the following events <br /> occur: <br /> 1. There is agreement among the Metropolitan Council,. the Waste <br /> Control Commission and Ramsey on the need and timing for <br /> the second Ramsey connection through the comprehensive <br /> plan review process. <br /> <br /> 2. This 'nee~,:is included in the Council's 208 Water Quality Plan. <br /> <br /> 3. Once in the 208 Water Quality Plan, the Waste Control Commission <br /> includes the second connecticn in its development program.. <br /> <br /> 4. Once approved as part of the development program, the <br /> facility then be included in the commission's annual <br /> capital budget presuming, of course, there will be <br /> metropolitan and federal dollars available. <br /> <br /> <br />