Laserfiche WebLink
Findings of Fact <br />River's Bend <br />page 5 July, 1984 <br /> <br /> The following is a list of reports relating to construction of <br /> Wastewater Facilities which will serve the proposed development: <br /> <br /> 1. "CAB Facilities Study Committee Report," Metropolitan <br /> Council, May, 1976 <br /> <br /> 2. "North Area Sanitary Sewer Study," Metropolitan Council, <br /> prepared by Orr Schelen Mayeron and Associates, <br /> November, 1973 <br /> <br />e <br /> <br />"Analysis and Treatment at Anoka Wastewater Treatment <br /> Plant", Metropolitan Waste Control Commission, <br /> September, 1975 <br /> <br />4. "Design Report, Anoka Interceptor," prepared by Short <br /> Elliot Hendrickson, Inc., March, 1978 <br /> <br />5. "Facilities Planning Report for the Champlin Anoka <br /> Brooklyn Park Interceptor," Metropolitan Waste Control <br /> Commission, prepared by Orr Schelen Mayeron and Assoc- <br /> iates, March, 1975 <br /> <br />6. "Review of North Area Sanitary Sewer Study," Metropoli- <br /> tan Waste Control Commission, prepared by Orr Schelen <br /> Mayeron and Associates, Toltz King, Duvall Anderson and <br /> Associates, and Consulting Engineers Diversified, Dec- <br /> ember, 1974 <br /> <br />"Northwest Area Study, Final Report," Metropolitan Waste <br /> Control Commission, prepared by Consulting Engineers <br /> Diversified and CH2 MHill, June, 1980 <br /> <br /> <br />