Laserfiche WebLink
6) <br /> <br />The building is not designed with an automatic sprinkler <br />system as required. Council has in the past waived this <br />requirement contingent upon the Developer entering into <br />an agreement with the City to provide sprinklers within <br />30 days of availability of City water. <br /> <br />~ 7) Handicap access to the building as required is not shown <br /> on the plans. <br /> <br />Handicap toilets as required by Code are not shown on <br />the plans. <br /> <br />9) Code requires one service sink per floor and none are <br /> shown on the plans. <br /> <br />ll) <br /> <br />A water fountaiu as required by Code is not indicated on <br />the plans. <br /> <br />The removable chain rail on the mezzanine level does not <br />comply with the requirements of the code. <br /> <br />12) The plans as received have not been signed by an architect <br /> or engineer. <br /> <br />I would conm~ent that developments of this type are a real asset to the <br />City and we should make every effort to work with ~r. Sharp. <br /> <br /> <br />