Laserfiche WebLink
The study and report a outlined above shall be prepared at a cost not to exceed <br />$14,500 unless scope changes are made and mutually agreed upon. In the event the <br />City elects to cease the project following Phase I the total amount due to the <br />Engineer would be $2,500. <br /> As water projects are implemented by the City utilizing the Water Study and <br /> Report, the Engineer shall apportion the study and report cost as a credit <br /> against fees earned for the final plans and specifications for such projects. <br /> The basis for the apportionment shall be the area for which ~uch plans and <br /> specifications are prepared as a fraction of the total area covered by the study <br /> and report. <br /> yment for the study and final report shall be due and payable within 3D days <br /> f~ollowing the time the report is furnished to the City, or in no case at a date <br /> earlier than September 1, 1981. If only Phase I is completed payment shall be <br /> due 30 days. following completion. <br /> In Witness Whereof, the City has caused this Agreement to be executed by authority <br /> of its City Council, by its Mayor and City Admin!strator, and the Engineer has <br /> caused the same to be executed by its President and Principal Representative as <br /> of the day and the year first above written. <br /> <br />· LTiNC~r.~IGiREER~~, I~.~NC. . <br /> <br /> By -~ '~'p~ncipa Representative <br /> <br /> <br />