My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 04/25/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:02:28 PM
Creation date
4/21/2006 2:37:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brook?field 2"a Addition - Final Plat <br />April 21, 2006 <br />4 of 6 <br />Grading and Drainage Plans: A final grading and drainage plan has been prepared for this <br />subdivision by Passe Engineering, Inc. Staff offers the following comments on this plan: <br /> 1. Proposed elevations need to be provided on lot comers and along the centerline of <br /> drainage swales listed below: <br /> <br />L 10 B 1 Sline~rearyardD&Ueasement <br />L 12 B 1 SE corner <br />L :2 B 2 Wline~rearyardD&Ueasement <br />L 2 B 2 SWcorner <br />L 7 B 2 NE corner <br />L 9 B 2 S line ~ centerline of swale <br />L 10 B 2 Sline@centerlineofswale <br />L 11 B 2 Sline~centerlineofswale <br />L, 12 B 2 Sline~centerlineofswale <br />L' 6 B 3 SWcorner <br />L 10 8 3 NWcorner <br />L 16 B 3 SWcorner <br />I 20 B 3 NE corner <br />L 1 B 4 SWcorner <br />L 6 B 5 E line ~ centedine of swale <br /> <br />2. Lots I4, 15 and 25 of Block I must have a minimum elevation of 875.0 to meet the <br /> LR.RWMO requirement of being two feet above the 100 year floodplain elevation. <br />3. Add rear yard drainage and utility easements for Lot 1, Block 5 and Lot 2, Block 5. Add <br /> side yard drainage and utility easements for the plan for Lot 2, Block 5 and Lot 3, Block <br /> -'5. <br />4. Add FES elevations for FES 3 and FES 5. <br />5. The maximum slope should not exceed one foot vertical to four feet horizontal. The <br /> slopes on pond slopes and berms appear to be one foot vertical to three feet horizontal. <br />6. The lot grading table should include the style of structure, the front yard slope, the rear <br /> yard slope, and a notation on which lots have yard grades less than 2% which will require <br /> a grading certificate prior to occupancy. <br />7. The tree preservation boundary should be added to the grading plan. <br />8. A permit from the Lower Rum Pdver Water Management Organization must be obtained <br /> for Bmokfield Second Addition. <br /> <br />Utilities: This subdivision will be served by municipal sanitary sewer and water service which <br />will be extended to the site via a separate contract. Service to tiffs subdivision will be dependant <br />upon this contract and the development of the Sweet Bay Ridge and Broolcfield Addition <br />subdivisions. Certificates of occupancy will not be issued until the City sanitary sewer and <br />watermain are fully functional and must include permanent vehicular access to the lift station. <br /> <br />The final construction plans submitted provide for only, one connection to the water supply. Fire <br />flow demands will not meet minimum requirements without a looped water system provided to <br />this development, nor will it provide a necessary second, connection to provide system reliability. <br /> <br />-268- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.