Laserfiche WebLink
Mr. Bruce Westby <br />July 18, 2023 <br />Page 3 <br />Utility Coordination <br />We have already completed a full GSOC design locate for the original plans. But due to the time elapsed, <br />we will initiate another full Gopher State One Call locate to pick up any new or modified private utility lines <br />since 2021. We will coordinate with the surveyors to locate all marked locations as part of our topographic <br />survey of the revised plan sheet project areas. The team will also use their expertise to lay out the right- <br />of-way boundary and adjacent properties for the project area. This information will be essential for <br />creating an accurate base map file and Digital Terrain Model. <br />Identification of potential conflicts or utility improvement needs and ongoing coordination with the public <br />and private utility companies are key components for a smooth -running project. The SEH team proposes <br />to review with the utility companies at the start of the project (after the topographic survey and existing <br />water main locating performed by the City of Ramsey). This is proposed for two purposes: to inform the <br />utilities of the updated project re -design and schedule, to gather the most accurate information from them <br />about the existing utilities, and to verify all utilities were captured by our topographic survey. Additional <br />time for coordination has been included in the proposal for potential coordination with affected utilities. <br />Preliminary Design <br />Prior to going into final design and preparation of bidding documents, we will meet with the City to review <br />all the changes made at the request of the City for the rebidding process to confirm we have captured all <br />the new water main facilities and identified the correct locations for open cut versus HDD. At this meeting <br />we will also confirm the final details of the 143rd Ave NW Street design to be incorporated into the plans. <br />It would be desirable to minimize any pavement or curb replacement as part of this project due to the <br />heavy construction traffic that will use this road during the WTP construction and access to adjacent <br />commercial properties. This task includes the design of the meter vault and all associated disciplines to <br />prepare the plan sheet and technical specifications, i.e. process piping, electrical, mechanical, etc. <br />Final Design <br />After the preliminary design meeting for the revised water main plans is complete, Dave will lead the team <br />into final design of the proposed improvements to meet the deadline of bidding this project in fall of 2023. <br />The chosen installation approach of the water main will be designed to meet the AWWA, MDH and City of <br />Ramsey standards. This will include design of impacted infrastructure such as trails, pedestrian ramps, <br />driveways, storm sewer, sanitary sewer, curbing and miscellaneous restoration items. <br />An updated Project Manual and final Engineer's Estimate will be developed. In discussions with the City, <br />SEH will set up the final bid schedules and details that may be different from the option used last time <br />which was to bid both open cut and HDD to allow contractors to choose their method of installation. <br />SEH will submit for needed agency reviews and permits. <br />Bidding Documents & Bidding Process <br />SEH will prepare the project specifications and bidding package, and the project can be advertised once <br />City Council approval of the plans has been completed. SEH's project manager and technical experts will <br />be available throughout the bidding process for questions. We will attend the bid opening and analyze the <br />bids in order to give a contract award recommendation to the City. <br />SEH will provide all project base files to the City in AutoCAD Civil 3D as well as all digital plan sheets. <br />