My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/22/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 08/22/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:24:55 AM
Creation date
8/18/2023 12:01:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/22/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />� Hakanson SECTION 2 <br />In Anderson PROJECT UNDERSTANDING <br />Ford Brook Estates 3rd Addition Street Reconstruction <br />This project area consists of Barium Street NW and i8oth Avenue NW within the Ford Brook Estates 3rd Addition <br />subdivision. These roads currently utilize bituminous curb for drainage and the pavement is deteriorating in the <br />drainage path. The design will analyze replacing the bituminous curb with concrete curb and gutter to improve the <br />drainage and extend the life of the pavement. <br />Section Unplatted Street Reconstruction <br />This project area consists of Waco Street NW, from 179th Lane NW to the municipal border, and also includes Waco Drive <br />NW, from Waco Street NW to the municipal border. It is contemplated that the City of Nowthen will also reconstruct <br />the segments of Waco Street NW and Waco Drive NW from the municipal border to the north simultaneous with the City <br />of Ramsey. These roads currently utilize bituminous curb for drainage, which is in poor condition, and the design will <br />analyze replacing the bituminous curb with concrete curb and gutter to improve the drainage and extend the life of the <br />pavement. <br />Project 2 IP4*24-05 Municipal State Aid — Xkimo Street <br />This project area consists of the reconstruction of Xkimo Street NW, from the cul-de-sac near Bunker Lake Blvd to <br />Highway 47. Xkimo Street currently utilizes concrete curb and gutter and storm sewer to convey the stormwater runoff. <br />The concrete curb and gutter will be evaluated and damaged portions and/or panels that have settled will be scheduled <br />for replacement. This project will require detailed traffic control and staging plans due to the business and local traffic, <br />as well as the signalized intersection and median at the Highway 47 intersection. This road is a Municipal State Aid <br />Route and the plans will be prepared in accordance with MnDOT requirements such that Municipal State Aid funding <br />may be utilized. <br />PROJECT UNDERSTANDING 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.