Laserfiche WebLink
a) <br />m <br />Ts <br />a) <br />s <br />u <br />cn <br />VI <br />4-1 <br />a) <br />m 0 <br />= a <br />L <br />,o 4, <br />u w <br />a <br />a) <br />0 <br />L <br />E <br />N <br />0 <br />N <br />2024 <br />January February March April May June July August September October <br />7 14 21 281 LF 11 18 251 2 9 16 23 301 6 13 20 271 4 11 18 251 1 8 15 22 291 5 12 19 261 4 11 18 251 1 8 15 22 291 6 13 20 271 3 10 17 241 1 8 15 22 291 5 12 19 261 2 9 16 23 301 7 14 21 28 <br />PHASE 3 - CONSTRUCTION PHASE <br />Construction <br />PHASE 4 - RECORD DRAWINGS <br />2023 <br />August September October November December <br />1 <br />Pre -Construction Conference <br />1 <br />As-Builts/Record Drawings <br />Description <br />PHASE 1 - PROJECT UNDERSTANDING & TOPOGRAPHIC SURVEY <br />Geotechnical Investigation <br />Gopher State One Call <br />Topographic Survey <br />PHASE 2 - DESIGN INCLUDING PLANS AND SPECIFICATIONS <br />Existing Utilities Review <br />Field Reconnaissance <br />Preliminary Design <br />Utility Design Meeting <br />Construction Drawings <br />Prepare Final Documents <br />Final Construction Cost Estimate <br />Quality Control Review <br />Bidding Process <br />Bid Opening <br />Award Project <br />