Laserfiche WebLink
TIIiI <br />Hakanson <br />Anderson <br />STREET/RECONSTRUCTION <br />City of St. Michael - Consultant Engineer <br />LOCATION: <br />1 1 80o Town Center Drive NE <br />St. Michael, MN 55376 <br />763-416-7931 <br />CONTACT PERSON: <br />Steve Bot, City Administrator/ <br />Public Works Director <br />Cody Holmes, City Engineer <br />PROJECT COST: <br />$1.4 Million <br />FUNDING: <br />Local <br />STATUS: <br />Constructed <br />n <br />2023 Street Reconstruction Project <br />The City of St. Michael retained Hakanson Anderson to prepare detailed plans and <br />specifications for the reconstruction of several local streets, including Naughtor <br />Avenue, Needham Avenue, Nelmark Avenue, Odean Avenue, 43rd Street, and <br />54th Street. This project consisted of reclaiming the existing bituminous surface, <br />replacing culverts, correcting drainage issues, and reconstructing the roadways. <br />The project also included constructing new sanitary sewer to provide services to <br />the businesses along 43rd Street. The biggest challenge with this project was <br />coordinating the phasing of the project areas and the affected residents. <br />The Hakanson Anderson team successfully coordinated the project with the -o0 <br />existing residences. Detailed staging plans were prepared and multiple contract <br />milestones were established in the Project Manual to ensure continuous progress <br />in each project area once the work was commenced. The project was substantially <br />completed in 2023. <br />2023 STREET RECONSTRUCTION PROJECT <br />CONSTRUCTION PLANS FOR BITUMINOUS RECLAMATION, BITUMINOUS SURFACING, SHOULDERING, <br />STORM SEWER, RESTORATION AND MISCELLANEOUS CONSTRUCTION <br />CITY OF ST. MICHAEL, MINNESOTA <br />.-• 11 6CTH STREET <br />11111 <br />LI <br />dill« <br />r ILI=• <br />_ µel iT os Era Ell <br />== ,�r <br />■ <br />Ill <br />:rik <br />zty„„ <br />I <br />CM En,l„wn and Lv.d ]urwp. <br />sadi Tn�n.Inn �,�, .sae. u iii- sssas <br />�4a-�v-eeeD rAz 7ar�v-DezD <br />THE SltrIACE Un Ln7 INFOETMATION <br />IN THIS PLAN IS untm QUALRTI' LEVFl <br />DA THIS OUALRY ra VAS DETERMINED <br />AGOORDING TO THE GUIDELINES OF <br />Cl/ASCE 3E-2, FNnRm "STANDARD <br />GUIDELINES FOR THE COLLECTION AND <br />DEPICTION OF EXISTING SUBSURFACE <br />UTILITY DATA" <br />I rrrwn <br />PROJECT LOCATION <br />WO 0 KO <br />SOLE <br />CITY OF ST. MICHAEL, <br />WRIGHT COUNTY, <br />MINNESOTA <br />GOVERNING SPECIFICATIONS <br />THE 2020 EDITION OE THE MINNESOTA D'c'Z EHT Of TRANSPORTATION <br />'STANDARD SPECIFlCATIONS FOR CONSTRUCTION" SHALL APPLY. <br />THE 201E EDITION OF THE CETY ENGINEERS ASSOCIATION OF MINNESOTA <br />(CEAM) STANDARD SPECIFICATONS SHALL APPLY. <br />ALL FEDERAL, STATE AND LOCAL LAwS, RF GU UiIONs, AND ORDINANCES <br />SHALL BE COMPLJED wrtH IN THE CONSTRUCTION OF THIS PRaECT. <br />ALL TRAF FTC CONTROL DEVICES AHD SIGNING StLALL CONFORM TO THE <br />LATEST EDRION OF THE 41NNESOTA MANUAL ON UNIFORM TRARIC <br />CONTROL DEVICES, NCLUDINC TIE LATEST FIELD MANUAL FOR <br />TEMPORARY TRAFFIC CONTROL 20NE LAYOUTS. <br />ALL REQUIREMENTS OF THE PROJECT MANUAL FOR THE 2023 STREET <br />RECONSTRUCTION PROJECT. <br />SHEET INDEX <br />THIS PLAN CONTAINS 104 SHEETS <br />SHFTi NO. DESCRIPTION <br />TITLE SHEET <br />GENERAL <br />LCOOCNASno <br />TiHCiP <br />NOTES Oro TABULATIONS <br />TYPK:AL SECTIONS <br />DETAILS AND PROJECT LEGEND <br />nETULs <br />Cr" <br />STAHMRD PUTES <br />DOSIING TCPOFitAPHY AND FEIDVALS PLMNZT"11 TTDR AT''' <br />F70511Nc TOPOGRAPHY AHD REWYAIS RAN-66TM STREET <br />MI NG TOPOGRANY AND REMOVALS PLAN-00FAN AVEWE <br />EJOSTNG TOPOGRAPHARIDY AND REMOVALS PLAN-NEAIEMIE VENUE <br />L>o3„ID TOfQOIWHY FE]p'ALLS HAN-I®IMY EDIMY AAID NFlI/A( AYEI4E <br />COSH. TOPOGRAPHY AND REMwALS PUN-NEU/ARK MEI. <br />D3SIENG TMOGRAPNY AND REMOVALS PUN-54TH STREET <br />E70 M G TOPOGRAPHY AND REMOVALS PLAN-34TH STREET (EAST) <br />OWING TOPOGRAPHY AND REMOVALS PU01-63RD STREET <br />STREET CONSTRUCTION PLAN-NAlRH1OR AVEIRIE <br />STRESS CONSTRUCTION PLAN-�dTH STREET <br />STREET CONSTRUCTION PUN-00CAN MERLE <br />BEREFT CONST WT10N PUN-NEI:DHAM AVTMIE <br />STREET CONSTRUCTION PUN-NEFDIUJI AVOl1E AND 1133011L AVENUE <br />STREET CONSTRUCTION PUN -NE]. 4RX AMEBAE <br />STREET CONSTRUCTION PLAN -SRN STREET (NEST) <br />SEREST COISTIil1CT10N PUN-rrip STRUTS (EAST) <br />SANRARY SEVQt CQ6TRUC110N PUN-4.IIND STREET <br />STREET CONSTRUCTION P1.04-43R0 STREET <br />sula' P1AIHilUm BRIEFS <br />ovFRALL n�1rTRc coNTRGL PUN <br />TRAFFIC CONTROL PLAN-LA►E CLOSURE <br />ROSS SEC11016-NAUGHTOR AVENUE <br />ROSS SECTIONS-SQTH STREET <br />ROSS SECTIONS -OM. AVFIAE <br />ROSS SECTIC>16-NEEDHAM:VENUE <br />ROBS SFOTIOI4S-NELYARK VEf41E <br />ROSS SECTI016-54TN STREET (NEST) <br />ROA siXTKN5-SqM STREET (EAST) <br />ROBS SLx11016-43RD STREET <br />CQfSTRUCTION PUVI EZETVE PARR PARK. LOT <br />DATE <br />APP D, NICK UPREISLER <br />T. MCNAEL CETY ENGINEER <br />I hsrsby osrtlfy That this plan, •psclfloatlon, or sport ras pnptlrsd <br />11 Ms of und.r Iny tlllrct ewes Milan tl1W 1htl1 Om tl duly Llcsnsed <br />Prolsnlonol Enpinssr under Ihs lays o} Ihs Sto 1. of Ylnnssota. <br />StUJ1E M. NELSON, P.E. <br />HAKANSON ANDERSON <br />DESIGN ENGNEFF <br />433E1 <br />LIC, NO. <br />DATE 3/9/23 <br />DATE <br />REVISION <br />3/2t/22 <br />ADOENOUY MO. 1 <br />SHEET 1 OF 60 SHEETS <br />REFERENCES — STREET/RECONSTRUCTION 17 <br />