My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/22/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 08/22/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:24:55 AM
Creation date
8/18/2023 12:01:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/22/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIIiI <br />Hakanson <br />Anderson <br />City of Anoka - <br />LOCATION: <br />2015 - 1st Avenue N. <br />Anoka, MN 55303 <br />763-576-2781 <br />CONTACT PERSON: <br />Greg Lee, City Manager <br />PROJECT COST: <br />Range from $85o,000 <br />to $2,700,000 <br />DESIGN CRITERIA: <br />Municipal State Aid <br />and City Standards <br />FUNDING: <br />Assessment, Municipal <br />State Aid and Local <br />STATUS: <br />Ongoing <br />STREET/RECONSTRUCTION <br />Consultant Engineer since i985 <br />The City of Anoka implemented a comprehensive Street Renewal Program in 1999 to <br />systematically replace and upgrade its aging infrastructure, some of which dates to <br />the 188os. When residential streets are scheduled for reconstruction, the City trusts <br />Hakanson Anderson to complete a thorough investigation of the existing facilities in <br />order to coordinate and replace all old or undersized facilities. We have been assisting <br />the City of Anoka with its Street Renewal Program since its inception. <br />i 40 — 202,E Street Reriewal Progrd <br />The Street Renewal Projects typically consist of the complete reconstruction of streets, <br />storm sewer, sanitary sewer, watermain, sidewalk, lift stations, and small utilities <br />within existing urban neighborhoods. The aging sanitary sewer mains and laterals <br />are replaced, as well as the cast iron watermains. Hakanson Anderson assists the City <br />early on by helping to gain public support for the project at the annual neighborhood <br />meeting. During construction, frequent communication with the City and affected <br />property owners is the key in maintaining access and realizing a successful project. Our <br />design team always meets with the small utility companies early in the design process <br />to coordinate the impacts and allow the opportunity for replacement of private lines, <br />as well as City -owned electric facilities. The City Electric Utility seizes the opportunity <br />to replace the existing overhead cobra street lights with underground wiring and <br />decorative -style streetlights. <br />REFERENCES - STREET/RECONSTRUCTION 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.