My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/27/2023
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2023
>
Agenda - Planning Commission - 07/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:20:54 AM
Creation date
8/21/2023 9:48:46 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/27/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 4. Existing and proposed topography and drainage patterns; <br />2 5. Proposed storm water and erosion and sediment control practices; <br />3 6. Existing and proposed vegetation to be removed and established; <br />4 7. Ordinary high water level, blufflines, and all required setbacks; <br />5 8. Existing and proposed structures; <br />6 9. Existing and proposed impervious surfaces; and <br />7 10. Existing and proposed subsurface sewage treatment systems. <br />8 (7) Nonconformities. <br />9 a. All legally established nonconformities as of the date of this chapter may continue <br />10 consistent with Minn. Stats. § 462.357, Subd. le. <br />11 b. New structures erected in conformance with the setback averaging provisions of <br />12 section 920(F)(3)d are conforming structures. <br />13 c. Site alterations and expansion of site alterations that were legally made prior to the <br />14 effective date of this chapter are conforming. Site alterations include vegetation, <br />15 erosion control, storm water control measures, and other nonstructural site <br />16 improvements. <br />17 d. Legally nonconforming principal structures that do not meet the setback requirements <br />18 of section 920(F)(3) may be expanded laterally provided that: <br />19 <br />20 <br />21 <br />22 <br />23 <br />1. The expansion does not extend into the shore or bluff impact zone or further into <br />the required setback than the building line of the existing principal structure (See <br />Figure 5); and <br />2. The expanded structure's scale and bulk is consistent with that of the original <br />structure and existing surrounding development. <br />Figure 5. Expansion of Nonconforming Structure <br />Expansion of Nonconforming Structure <br />Expansion <br />Expansion allowed <br />not allowed <br />Shore Impact Zone <br />(50% of structure <br />setback) <br />River <br />OHWL <br />Structure <br />setback <br />OHWL <br />24 <br />25 (8) Notifications. <br />26 a. Amendments to this section and to the MRCCA plan must be submitted to the <br />27 Commissioner as provided in Minnesota Rules, part 6106.0070, Subp. 3, Items 6-I. <br />28 b. Notice of public hearings for discretionary actions, including conditional and interim use <br />29 permits, variances, appeals, rezonings, preliminary plats, final subdivision plats, master <br />30 plans, and PUDs, must be sent to the following entities at least 30 days prior to the <br />31 hearing: <br />32 1. The commissioner in a format prescribed by the DNR; <br />33 2. National Park Service; and <br />Page 102 of 160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.