Laserfiche WebLink
1 a. A detailed project description; and <br /> 2 b. Scaled maps and plans, dimensional renderings, maintenance agreements, and other <br /> 3 materials that identify and describe: <br /> 4 1. Primary conservation areas; <br /> 5 2. Public river corridor views; <br /> 6 3. Buildable area; <br /> 7 4. Existing and proposed topography and drainage patterns; <br /> 8 5. Proposed storm water and erosion and sediment control practices; <br /> 9 6. Existing and proposed vegetation to be removed and established; <br /> 10 7. Ordinary high water level, blufflines, and all required setbacks; <br /> 11 8. Existing and proposed structures; <br /> 12 9. Existing and proposed impervious surfaces; and <br /> 13 10. Existing and proposed subsurface sewage treatment systems. <br /> 14 (7) Non conformities. <br /> 15 a. All legally established nonconformities as of the date of this chapter may continue <br /> 16 consistent with Minn. Stats. § 462.357, Subd. 1 e. <br /> 17 b. New structures erected in conformance with the setback averaging provisions of section <br /> 18 920(F)(3)d are conforming structures. <br /> 19 C. Site alterations and expansion of site alterations that were legally made prior to the <br /> 20 effective date of this chapter are conforming. Site alterations include vegetation, erosion <br /> 21 control, storm water control measures, and other nonstructural site improvements. <br /> 22 d. Legally nonconforming principal structures that do not meet the setback requirements of <br /> 23 section 920(F)(3) may be expanded laterally provided that: <br /> 24 1. The expansion does not extend into the shore or bluff impact zone or further into <br /> 25 the required setback than the building line of the existing principal structure (See <br /> 26 Figure 5); and <br /> 27 2. The expanded structure's scale and bulk is consistent with that of the original <br /> 28 structure and existing surrounding development. <br /> Figure 5.Expansion of Nonconforming Structure <br /> Expansion of Nonconforming Structure <br /> C �f Yj�f�`Ssf`�03'l�ff'3t <br /> hS �E E�{ ,`�v 9 "��.w. <br /> Expansion <br /> Expansion '� k�.s �, allowed <br /> not allowed <br /> l3 K...d �:mvvbdni..wi <br /> QHWL <br /> Structure <br /> 5� setback <br /> v[�w":F?:ai:3%':::Sifg ��a"u+:eC 7°'?r?;i:'F,.+,e,',r.,%e :i:56.i'k 'r <br /> Shore Impact Zone .::,::. � :.:,.�sarz.. <t..;• rI.. '<> <br /> p3.f YtC:a"„;";,:'_. <br /> 50% f structure <br /> ?: ::, r;. •. •..:.,..,:r:.r:::.::.::::::•: <br /> :.:.r:.......' ::::...,.,...:, <br /> ::... r..:...::::.::::h: <br /> IN? <br /> JL LY4� _ ,..d.5'.=is s'?:3r-ax.+::'.'.iF?r,4£ii:v::i::ii;3::+iyi;.ic"'.�i2i%fuFisT.',ii3?.:f':#}%u <br /> +s.sr:r:>r::nxs•.:s::rs,:c:iiil <br /> .^.s-::s::r:..^.ss•.,s,.sn.: .g..,.S.., .a,ytC: <br /> :......s:;':a�:::x:.^.:�:;..;::r�::::;�;':.r:_::::..^.:ri:...vrata .. <br /> v:......:........... .•....................... ..: <br /> oHwL <br /> River <br /> 29 <br /> 30 (8) Notifications. <br /> 31 a. Amendments to this section and to the MRCCA plan must be submitted to the <br /> 32 Commissioner as provided in Minnesota Rules, part 6106.0070, Subp. 3, Items B-I. <br /> 33 b. Notice of public hearings for discretionary actions, including conditional and interim use <br /> 34 permits, variances, appeals, rezonings, preliminary plats, final subdivision plats, master <br /> 35 plans,and PUDs, must be sent to the following entities at least 30 days prior to the hearing: <br /> 36 1. The commissioner in a format prescribed by the DNR; <br /> Page 90 of 141 <br />