My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/13/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 02/13/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:08:07 AM
Creation date
2/14/2024 1:04:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Each zone and the controller shall be grounded pursuant to valve and controller <br /> manufactures specifications. <br /> • Each valve shall be in a green, irrigation box blocked and secured to industry <br /> standards. Valve boxes may be two, 12x17 boxes that is 6" deep, with the bottom <br /> box cut around the pipes and a second box to bring it to grade—or a single 12x17 <br /> box that is 12" deep. <br /> • Existing zone valve #7 shall be removed and capped. <br /> • The contractor shall work with the City to program the new controller and ensure <br /> each preexisting valve is properly connected and operational, following the new <br /> irrigation component's installation. <br /> Award and Selection Process: <br /> The City (Owner) anticipates award of landscape and irrigation project the day following <br /> City Council approval on February 13th, 2024. The city will award the project to the most <br /> responsible proposer. <br /> Right to Reject Quotes: <br /> The City of Ramsey reserves the right to award or reject any and all proposals in whole or <br /> in part, and to waive any informality or technical defects, in the City's judgment. <br /> Work and Staging Areas: <br /> Confine work activities to the parking lot area and protect the bituminous surface areas <br /> and pavement markings from marring. Contactor is responsible for protecting concrete <br /> and pavement edges from breaking and damage. No mechanized equipment shall be left <br /> overnight at the park (unless fenced), and no construction activity shall be performed <br /> before 7 AM nor after 4 PM Monday through Saturday. The contractor shall provide 72 <br /> hour advance notice before working on Saturday. City Council approval may be required <br /> for Sunday work. <br /> A special dumpster is not anticipated to be needed on site, and no construction related <br /> disposal is to be placed in the trash receptacles at the park. Contractor may dispose of <br /> any project refuse in the dumpster at Public Works, 14199 Jasper Street. <br /> Storage of Materials on Site or Off-site: <br /> Contractor shall not store materials on-site (E.g. wood chips or growers mix) unless <br /> expressly approved by the City. Storage of materials is to be confined to areas <br /> designated by the City if any. City will not sign for, or be responsible for, materials <br /> delivered to the site. <br /> 41Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.