Laserfiche WebLink
a construction plant and equipment, and all other relevant matters pertaining to the complete <br /> execution of this Contract. <br /> After Bids have been submitted, the Bidder shall not assert that there was a misunderstanding <br /> concerning the quantities of Work or of the nature of the Work to be done. The failure or omission <br /> of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation in <br /> respect to their Bid. <br /> The Contract Documents contain the provisions required for the construction of the Project. <br /> Information obtained from an officer, agent or employee of the Owner or any other person shall <br /> not affect the risks or obligations assumed by the Contractor or relieve the Contractor from <br /> fulfilling any of the conditions of the contract. <br /> The Contractor certifies that it has been provided full opportunity to review the construction <br /> documents and field conditions so as to ensure that it fully understands the design intent shown <br /> and that all elements for construction shown thereon have been included in the contract price. The <br /> contractor will have 30 days from award of contract in which to identify any design deficiencies <br /> in the construction documents. The contractor agrees to waive any claim for extra cost or delay <br /> related to any error or omission in the construction documents that reasonably should have been <br /> observed during this 30-day review period. <br /> The site is identified in the Plans and Contract Documents.All additionalland(s) and access thereto <br /> required by the Bidder for temporary construction facilities, equipment or storage of material and <br /> equipment to be incorporated in the Work are to be obtained and paid for by the Bidder. See <br /> General Conditions Article 11 for additional instructions to Contractors on additional land(s) and <br /> access thereto that may be required for temporary construction facilities or storage of materials <br /> and equipment. <br /> 5. USE OF ONLINE BIDDING PLATFORM <br /> This project will be bid using on-line bidding platform know as Quest VirtuBid (VBID).No paper <br /> bids will be allowed. See the appendices of these specifications for instructions on use of bidding <br /> tools. <br /> 6. INTERPRETATIONS AND ADDENDA <br /> All questions regarding the Plans and Contract Documents are to be submitted to the Engineering <br /> in writing. Addition, revisions, corrections and/or clarifications considered necessary by the <br /> Engineer in response to such question will be issued by Addenda posted by the Engineer to the <br /> QuestCDN website referenced in the Advertisement for Bids, and emailed to the plan holders in <br /> accordance with their notification settings assigned to their QuestCDN account. Responses not <br /> deemed necessary or within too short of time period to the receiving of bids may not be issued. <br /> Only questions responded to by Addenda will be binding. Oral interpretations to the Contract <br /> Documents which are available to the Bidder will be without legal effect. <br /> Quest VirtuBid will not allow a submittal of a bid without properly acknowledging any addenda. <br /> IB2 <br />