My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 07/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:47:31 AM
Creation date
7/15/2024 1:32:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 - PRODUCTS <br /> 2.1 TRAFFIC CONTROL DEVICES <br /> A. Conform to devices prescribed by the MMUTCD, or approved equal. <br /> B. Survey ribbon, lathe, or rope shall not be acceptable traffic control devices. <br /> C. Acceptable traffic control devices include MUTCD sign panels installed on Type <br /> III barricades and/or portable fencing panels, and approved equals. <br /> 2.2 EQUIPMENT <br /> A. All equipment shall be appropriately sized and suitable for use on paved trails. <br /> B. All propelled equipment shall be rubber-tired. <br /> C. Audible and/or visual devices shall be installed on equipment, as appropriate, <br /> to provide advance warning to trail users. <br /> PART 3 - EXECUTION <br /> 3.1 EXAMINATION <br /> A. The Contractor shall coordinate a site meeting with the City of Monticello <br /> Representative prior to commencing construction activities to generally review <br /> the scope of work and to ensure that the requirements of Part 1.2.D are <br /> acceptable. <br /> B. Receive approval to proceed from City of Monticello Representative. <br /> 3.2 PERFORMANCE <br /> A. Operate equipment in a responsible manner. Operate audible or visual <br /> devices, as needed, to ensure safety of approaching trail users. <br /> B. Provide traffic control devices as shown in the plan. Relocate devices during <br /> performance of the work, as needed. <br /> C. Cracks shall be prepared by routing or blowing out debris with compressed air <br /> and heating the crack face with a hot air lance before filling with Crafco <br /> asphalt rubber plus #34241. All routed cracks must follow technical specs <br /> TR21 TR3. See attachment. <br /> Alternate 1 - Crack Filling: This work shall consist of performing crack <br /> filling following technical specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.