My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 07/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:47:31 AM
Creation date
7/15/2024 1:32:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS <br /> SECTION 2 - T-MAT ASPHALT RESURFACING <br /> PART 1 - GENERAL <br /> 1.1 SUMMARY <br /> A. This section includes application of a polymerized asphalt emulsion, <br /> containing fibers and aggregates, to existing bituminous surfaces. <br /> 1.2 PROJECT CONDITIONS <br /> A. Application shall be performed only when the following conditions are present: <br /> 1. Air and surface temperature exceed 70 degrees F. and <br /> 2. Relative humidity is less than 60%, and <br /> 3. Rain has not fallen in the past 8 hours and <br /> 4. Rain is not forecasted in the next 24 hours, and <br /> 5. Next day high temperature forecast exceeds 70 degrees F. <br /> B. Placement of the product shall be performed Monday through Wednesday, <br /> excluding holidays, during the hours of 7:00 AM to 7:00 PM, unless otherwise <br /> approved by the City of Monticello. <br /> C. All Trails shall be open to the public Friday - Sunday <br /> D. Contractor shall notify the Parks Superintendent not less than 2 days prior to <br /> commencing work activities, excluding weekends and holidays, such that the <br /> Owner can provide adequate advanced trail closure notice to staff and public. <br /> E. Prior to commencing work, the Contractor shall demonstrate compliance to <br /> the following requirements, to the satisfaction of the City of Monticello: <br /> 1. Safety: <br /> a. Refer to the conditions of the Proposal Form. <br /> b. Contractor use of City of Monticello-furnished signage shall not <br /> relieve the Contractor of any requirements or responsibilities <br /> for safety on the project. <br /> 2. Maintenance of Traffic: <br /> a. The Contractor shall CLOSE the paved trail to public use for the <br /> duration of the work, including curing and drying of the <br /> product, as shown in the drawings. <br /> b. Coordinate all traffic control and closures with the City of <br /> Monticello Representative one week prior to any closures. <br /> C. All turf trails shall remain OPEN to public use throughout the <br /> duration of the work, unless otherwise approved by the City of <br /> Monticello Representative. The Contractor shall maintain traffic <br /> through the turf trail segment crossings depicted on the <br /> Drawings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.