Laserfiche WebLink
10. <br /> <br />The ingress and egress to the Subject Property shall be from Armstrong Blvd. NW and a <br />private easement across Lot 2, Block 1, HY-10 Ramsey 2nd Addition. The Permit Holder <br />shall utilize an existing gravel approach at the access point onto Armstrong Blvd. NW to <br />minimize the tracking of grading materials from the site onto the public highway. The <br />Permit Holder shall be responsible for obtaining and complying with any permits deemed <br />necessary from Anoka County. In addition, the Permit Holder shall be responsible for <br />removing any spilled material from the public roads immediately upon direction to do so <br />by the City Engineer. Failure to do so shall be cause for the City Engineer to order the <br />necessary work to be done and billed to the Permit Holder. <br /> <br />All grading operations shall be conducted in compliance with the Grading Plan to be <br />prepared in accordance with the Planning Commission discussion that all final grades have <br />a minimum of one-half percent to the 875 contour. The plan shall be reviewed and <br />approved by the City Engineer. <br /> <br />All equipment used for grading and hauling operations shall be maintained and operated in <br />such a manner to minimize noise, dust, and vibrations adversely affecting surrounding <br />properties. All equipment shall be kept in good repair. Failed equipment and rubbish shall <br />be removed from the work site regularly. <br /> <br />Only equipment required for the excavation, grading and hauling of materials shall be <br />allowed onto the site. Equipment associated with the processing of the excavated materials <br />such as crushers, washers, conveyors, etc., are prohibited. <br /> <br />All work sites shall be properly safeguarded to prevent the general public from depositing <br />garbage or other refuse on the work site. <br /> <br />Prior to the removal of trees, the City Engineer shall be notified at least 72 hours in <br />advance of the removal so that the number of trees required for reforestation can be <br />determined. <br /> <br />Grading operations shall be conducted in such a manner to minimize interference with the <br />surface water drainage outside the boundaries of the operation. <br /> <br />Fencing may be ordered by the City Council or City Engineer anytime the permit is in <br />force and shall be installed within 24 hours of written notice. <br /> <br />All haul roads to and from the Subject Property shall be maintained in order to minimize <br />dust and in a condition satisfactory to the City Engineer. This work shall include <br />application of water, bituminous material, or calcium chloride to the road surface as may <br />be necessary to alleviate dust nuisance and eliminate traffic hazards. This work shall also <br />include daily inspections of Armstrong Blvd. NW and the removal of spillage of any <br />materials from the operation. When hauling operations are completed, the permit holder <br />shall either restore that haul road to a condition at least equal to that which existed at the <br />time the hauling operations were started, or compensate the local road authority in an <br /> <br /> RESOLUTION #98-08-205 <br /> Page 2 of 5 <br /> <br /> <br />