<br />extended to a site located between ball fields A and C as shown by the plans. That is the <br />planned location for the irrigation control system and future concession stand. Mudrick also <br />offered to provide three (3) 4" conduits to be placed beneath the parking lot improvements for <br />future extension of utilities. These conduits would also be used by other utility companies. <br />Mudrick indicated that the utilities would be provided at no charge to the City except for the <br />application fees as required by his office. Mudrick indicated that the contact person for this <br />project would be Paul Orndorff and that he could be reached at 323-2761. Mudrick also <br />indicated that conduit could be ordered by contacting either Tony or Barb at 323-4218. <br /> <br />Ralph Bistodeau of U.S. West Communications indicated that they have a 200 pair telephone <br />line on the south side of 153rd Avenue. Bistodeau indicated that one of the sleeves provided by <br />ABC could be used for the extension of phone service for future pay phones if requested by the <br />City. Bistodeau indicated that the City would need to fill out a service order form through his <br />office. <br /> <br />The next issue discussed was construction permits. Graham indicated that he had contacted the <br />Minnesota Department of Health and that no watermain permit was required for the irrigation <br />system. Graham will prepare the Minnesota Pollution Control Agency (MPCA) grading <br />permit and provide it to V ollhaber for his signature. Graham also has spoken with Randy <br />Burnyeat of the :MJ>CA-Solid Waste Section regarding the near-by landfill. Graham had <br />provided correspondence to the City and Burnyeat, dated September 11, 1997, regarding this <br />matter. Burnyeat's major concern was that the monitoring wells located on the site be <br />protected during construction. <br /> <br />With regard to watershet permits, Jankowski also discussed his conversation with Bob <br />Obermeyer of the Lower Rum Water Management Organization regarding this project. <br />Jankowski asked that Graham contact Obermeyer following the meeting. Graham discussed <br />this project with Obermeyer on September 24, 1997, who indicated that silt fence and hay bale <br />checks will need to be added in several locations. Obermeyer also indicated that a clear <br />delineation be provided between the existing wetland and the newly excavated wetland so that <br />the materials do not mix during construction. Finally, Obermeyer indicated that a NERP pond <br />would need to be provided at the east end of the parking lot to control run-off in this area. <br />Graham has prepared a plan revision and submitted it to Obermeyer for his review and <br />approval. Obermeyer indicated that no work could begin on the project until this plan revision <br />is approved. Forest Lake Contracting will need to provide a unit cost for the silt fence and hay <br />bale checks and the nerp pond construction will be added on a per cubic yard basis. Mark <br />Boos, the City Parks Department Director, indicated that he will want to verify this pond <br />location in the field during construction. Graham reiterated that it was his intent to not overly <br /> <br />Preconstruction Conference Minutes Page 2 <br /> <br />0:\proj\800560\560-2509.sept 'l <br />