My WebLink
|
Help
|
About
|
Sign Out
Home
1994 Working Papers
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1990-1999
>
1993 (Incompleted)
>
1994 Working Papers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2006 8:26:57 AM
Creation date
9/14/2006 8:22:00 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,,) <br /> <br />"#'" <br /> <br />! <br /> <br />MEMORANDUM <br /> <br />DATE: <br />TO: <br />CC: <br /> <br />November 18, 19~4 <br /> <br />Ramsey City Council <br /> <br />Planning Commission <br />Ryan Schroeder, City Administrator <br />Sylvia Frolik, Zoning Administrator <br />Steve Jankowski, City Engineer <br />Jim Gromberg, Economic Development Coordinator <br />Bill Smith, Biko Associates <br />Steve Schwanke, RLK Associates <br /> <br />FROM: <br />SUBJECT: <br /> <br />Economic Development Commission <br />Proposed Comprehensive Land Use Plan Update <br /> <br />The Economic Development Commission met with RLK Associates and Biko Associates on <br />October 20, 1994. This meeting was scheduled after the joint meeting with the Planning <br />Commission on September 15, 1994. At the last joint meeting, certain information was brought up <br />that required additional background as to its basis. The minutes of the October 20, 1994 meeting <br />are attached for your review. <br /> <br />Based upon the information provided by the consultants and Commission discussions, the <br />Commission, as a unanimous body, recommended the approval of the attached Figure 8 for the <br />Comprehensive Land Use Plan. <br /> <br />This recommendation is based on the following criteria: <br /> <br />1) Right-of-Way acquisition and acquisition costs: <br /> <br />Easterly acquisition: 10.14 acres of right-of-way to ac-quire <br />Westerly acquisition: 26.6 acres of right-of-way to acquire <br />The cost of the right of way is directly related to amount of property that needs to be <br />purchased. <br /> <br />2) The bridge should be centrally located to facilitate the areas that will see the greatest <br />growth. <br /> <br />3) The easterly alignment will allow for the bridge corridor to have ,a: limited impact on current <br />property uses and possible future land uses. The westerly alignment would disrupt the <br />development of the area south of Highway #10, as it continues to be slated for resid~ntial <br />developm~nt- <br /> <br />4) The easterly location will allow for better traffic flow by providing access to the north via <br />County Road #116 to both Armstrong Boulevard N.W. and Ramsey Boulevard N.W. <br /> <br />5) Surrounding communities are currently undecided as to the location of the bridge. The City <br />may be able to encourage the inclusion of this alignment in surrounding community's <br />Comprehensive Plans. <br /> <br />6) Either alignment will be required to have an - elevated. roadway which would cause <br />disruption of the possible residential uses in the westerly alignment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.