Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />ofInterior Standards for Historic Preservation and Cultural Landscapes (Policy 2), and <br />incentives be provided for preservation efforts. <br /> <br />Page 55 - Transportation Plan: This plan should consider impacts to the river corridor, <br />and it's resources, and consistency with the purposes of Executive Order 79-19. <br /> <br />Page 79 - Parks and Recreation Plan: Trail development in the river corridor (west of <br />Highway 10) should consider connections to the river. <br /> <br />Mississippi River Corridor Critical Area Plan <br /> <br />Policies in the Comprehensive Plan that address critical areaIMNRRA requirements <br />should be cross-referenced in the city's Critical Area Plan. <br /> <br />Page 91 - Photo caption: The MNRRA is a unit of the National Park System, not a <br />program. It was designated by Congress in 1988 under Public Law 100-696. <br /> <br />Page 92 - Correct the following sentences b ginning with "The partnership between the <br />Met Council, the National Park Service. . . is intended to assist local units of <br />government in updating existing plans and 0 dinances to ensure orderly and <br />environmentally friendly development. Tier II. . . adds voluntary policies to address <br />issues relating to . . ." <br /> <br />Replace the last sentence in this paragraph with "Communities who are consistent with <br />the voluntary policies in the MNRRA CMP become eligible for MNRRA grants to <br />implement the plan. <br /> <br />Page 107 - Strategy 5: The MNRRA opportunity map is Figure 23, not 20. <br /> <br />Page 108 - Continuous trail corridor: This will not be called a "MNRRA" continuous <br />trail corridor. It would be more appropriate to say a continuous trail corridor along, or <br />that connects to, the Mississippi River is an important vision ofthe MNRRA CMP. <br /> <br />The following additional policy statements should also be considered (Page numbers <br />reference the location ofMNRRA policies): <br /> <br />Riverfront Location Policies (Pages 16 - 18. MNRRA CMP) <br /> <br />Define the riverfront protection area as "the first 300 feet backfrom the river's ordinary <br />high water mark or the floodplain, whichever is greater. New development should have <br />a relationship to the river, a need for a river location, or the capacity to enhance the river <br />environment. (Structures should be set back 300 feet and preserve existing vegetation.) <br />