Laserfiche WebLink
Loading Docks: One loading dock is required for the first 10,000 feet of floor and one <br />additional dock for each additional 25,000 square feet. One loading dock is required with <br />the proposed building. The site plan indicates the location of one dock on the east side of <br />the proposed building. Additionally, all off- street loading dock/berth areas shall be a <br />minimum of fifty (50) feet in length. <br />Stormwater Management Fee: The city requires a payment for stormwater <br />management. The current rate is $3,965 per acre for stormwater management. This fee <br />totals $7414.55 for the property. The rate at the time of approval will be collected. <br />Sewer and Water Trunk Charges: Sewer and water trunk charges will be paid through <br />the Tax Increment Financing agreement between the property owner and the City of <br />Ramsey. <br />Sincerely, <br />Park and Trail Dedication: The park dedication fee and trail fee will be addressed <br />through the Tax Increment Financing Agreement between the property owner and the <br />City of Ramsey. <br />REU Number: This property will be subject to a storm water utility charge. The <br />quarterly charge is dependent upon the number Residential Equivalent Units (REU) <br />calculated for this property. This number will be calculated and an REU will be <br />calculated based on the total area of impervious surface coverage. <br />The City Council will be meeting at 7:00 pm on October 5 2006 at Fire Station #1 <br />(15050 Armstrong Blvd.), to review your site plan. You, or your representative, should <br />be present at the meeting to answer any questions that may arise. <br />If you have any questions, please call our office at 763 - 427 -1410. <br />CITY OF RAMSEY <br />Timothy Gladhi 1 <br />Management Intern <br />n <br />--1:72/6/. ,...,-.-;,-/ <br />Mike McDowall <br />Engineering Tech IV <br />