My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/28/2025
Ramsey
>
Public
>
Agendas
>
Council
>
2025
>
Agenda - Council - 01/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:54:23 AM
Creation date
1/31/2025 2:59:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/28/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
026 - <br />Revised <br />027 <br />028 <br />029 <br />030 <br />031 <br />009 <br />City <br />Request <br />010 RFP 007 <br />011 <br />011 — <br />Part B <br />Field Order <br />002 <br />Engineer <br />Direction <br />012 RFI 013 <br />013 RFP 005 <br />014 RFP 009 <br />015 <br />Field Order <br />004 <br />Door <br />016 Hardware <br />Meeting <br />017 RFP 010 <br />018 <br />019 <br />020 <br />Field <br />Directed <br />Field Order <br />012 <br />Field Order <br />013 <br />021 RFP 013 <br />022 <br />023 RFP 014 <br />024 RFP 015 <br />025 RFP 017 <br />026 RFP 016 <br />RFP 016 <br />Field Order <br />019 <br />Field Order <br />016 <br />Field Order <br />018 <br />Submittal <br />128B <br />RFP 018 <br />4f1FIE2s <br />Prevailing Wages <br />Backwash Supply <br />Piping Modifications <br />Electrical <br />Modifications <br />Electrical <br />Modifications <br />Accordion Folding <br />Security Door <br />Jet Mixing System <br />Pump Modifications <br />Backwash Tank <br />Overflow <br />Field Order No. 4 - <br />Door Hardware <br />Changes <br />Door Hardware <br />Changes <br />Filter Slab <br />Modifications <br />Conduit Encasement <br />North Sump Pit <br />CB1 Air Flow <br />Sleeves <br />Torpedo Sand Filter <br />Layer <br />Remove Penetron <br />Admixture <br />Reservoir Vent <br />Piping <br />BWW Piping <br />Relocation <br />Additional Waterstop <br />Water Wick Drain <br />Connection <br />Water Wick Drain <br />Connection <br />www.ae2s.com <br />$794,153.71 <br />$3,068.77 <br />$17,533.24 <br />$3,033.99 <br />$10,010.85 <br />$16,834.33 <br />$1,534.38 <br />$10,922.45 <br />$56,724.85 <br />$96,634.23 <br />Approved — <br />Change Order 01 <br />Approved — <br />Construction Contingency Expense 3 <br />Approved — <br />Construction Contingency Expense 7 <br />Approved — <br />Construction Contingency Expense 7 <br />Approved — <br />Construction Contingency Expense 3 <br />Approved — <br />Construction Contingency Expense 3 <br />Approved — <br />Construction Contingency Expense 3 <br />Approved — <br />Construction Contingency Expense 3 <br />Approved — <br />Construction Contingency Expense 3 <br />Approved — <br />Construction Contingency Expense 4 <br />Approved — <br />Construction Contingency Expense 4 <br />Approved — <br />Construction Contingency Expense 5 <br />Approved — <br />Construction Contingency Expense 5 <br />Approved — <br />Construction Contingency Expense 5 <br />Approved — <br />Construction Contingency Expense 6 <br />Approved — <br />Construction Contingency Expense 6 <br />Approved — <br />Construction Contingency Expense 6 <br />Approved — <br />Construction Contingency Expense 6 <br />Approved — <br />Construction Contingency Expense 6 <br />Approved — <br />Construction Contingency Expense 7 <br />Approved — <br />Construction Contingency Expense 7 <br />Pending — <br />Construction Contingency Expense 8 <br />Pending — <br />Construction Contingency Expense 8 <br />Pending — <br />Construction Contingency Expense 8 <br />Pending — <br />Construction Contingency Expense 8 <br />Note: Any extension delays will be approved as a separate Change Order and will not be included in this Construction <br />Contingency Expense. <br />West Backwash 30" <br />Wall Detail <br />Chemical <br />Containment <br />Modifications <br />Fencing <br />Modifications <br />100 amp Breaker for <br />Mixing Pump <br />CU 3 Relocation <br />$5,389.13 <br />$6,764.43 <br />$4,617.83 <br />$27,979.43 <br />- $5,920.00 <br />$3,645.52 <br />$5,504.74 <br />$10,749.95 <br />$3,144.81 <br />$5,948.79 (minus <br />the previously <br />approved amount <br />of $3,144.81) <br />$8,567.47 <br />$2,354.53 <br />$3,769.36 <br />$3,743.56 <br />$21,596.32 <br />Advanced Engineering and Environmental Services, Inc. <br />6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />
The URL can be used to link to this page
Your browser does not support the video tag.