My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/24/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 10/24/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:52:30 PM
Creation date
10/20/2006 3:17:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/24/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Brian Olson <br />City of Ramsey <br />Request for Additional Engineering Services Amendment No. 1 <br />CSAH 83 Reconstruction, Ramsey, Minnesota - C.P. 06 -20 <br />October 5, 2006 <br />Page 2 <br />• Allocate additional time for incorporating inplace CSAH 83 right -of -way <br />between CR 116 and Alpine Drive into basemap. <br />• Allocate additional time for incorporating inplace utilities along <br />CSAH 83 between CR 116 and Alpine Drive into basemap. <br />• Allocate additional time for re- survey of easterly CSAH 83 south of <br />Sunwood Drive and incorporating new survey data into basemap. <br />• Allocate additional time for field survey of wetland delineation and <br />incorporation into basemap <br />• Allocate additional time for field survey of soil boring locations and <br />incorporation into basemap." <br />The estimated hours for this item are included in the attached Supplemental Project Fee <br />Estimate under DATA COLLECTION. <br />C. Add the following items under II.0 - PRELIMINARY GEOMETRIC LAYOUT: <br />"10. Additional Preliminary Geometric Layout <br />Allocate additional time for preliminary geometric design of CSAH 83 between <br />CR 116 and Alpine Drive. <br />11. Design Coordination <br />Allocate additional time for coordination of preliminary geometric design of <br />TH 10 and the TH 10 /CSAH 83 intersection with Mn/DOT designers." <br />The estimated hours for this item are included in the attached Supplemental Project Fee <br />Estimate under PRELIMINARY GEOMETRIC LAYOUT <br />Add the following items under HD - TRAFFIC CONTROL SIGNAL SYSTEM: <br />"8. Traffic Signal Interconnection <br />Allocate additional time for the design and plan preparation of interconnection of <br />the proposed Sunwood Drive, CR 116, and Alpine Drive signals." <br />The total hours for this additional item is included in the attached Supplemental Project <br />Fee Estimate under TRAFFIC CONTROL SIGNAL SYSTEM. <br />E. Add the following items under II. E - DETAIL DESIGN PLANS AND <br />SPECIFICATIONS: <br />"4. Additional Detail Design Plans and Specifications <br />Allocate additional time for the detail design of, and the preparation of plans and <br />specifications for, CSAH 83 from CR 116 to and including Alpine Drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.