My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 05/13/2025
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2025
>
Agenda - Council Work Session - 05/13/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 11:22:56 AM
Creation date
5/8/2025 3:51:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
05/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. 2. <br />CC Work Session <br />Meeting Date: <br />Primary Strategic Plan Initiative: <br />05/13/2025 <br />Identify and implement operational efficiencies, cost savings and additional <br />funding sources. <br />Information <br />Title: <br />Consider Request to Advance Replacement of 2009 Jetter-Vacuum Truck <br />Purpose/Background: <br />The adopted 2024 - 2033 Capital Improvement Program includes a request to replace the 2009 jetter-vacuum <br />combination truck, PW Unit #673, in year 2026. PW Unit #673 is used to clean various components of the city's <br />sanitary sewer and storm sewer systems, including sewer pipes, sanitary sewer and stormwater lift stations, and <br />stormwater hydrodynamic separator structures. It is also used to hydro -excavate utilities. <br />PW Unit #673 is generally used daily and is an emergency response vehicle. In the event of a sewer back-up, this <br />is the first unit to be dispatched. <br />PW Unit #673 is 16 years old. To date, the city has spent $47,212.84 on repairs to this truck. Of this amount, <br />$32,945.01 has been spent over the past 3 years. This unit is becoming less and less reliable and on multiple <br />occasions in recent months, staff have had to drive the truck straight to the mechanic's area for repairs <br />immediately after starting it. <br />Last year, the replacement of PW Unit #673 was moved up in the CIP from 2029 to 2026. At the time, staff <br />anticipated a replacement cost of $850,000. However, staff since requested replacement quotes from 3 vendors <br />and the lowest quote was $647,324 based on purchasing the truck in 2025. However, this vendor recently <br />contacted staff and stated if the city waits to purchase a replacement jetter-vacuum combination truck until 2026, <br />the purchase price will increase by $72,417. According to the vendor, the additional costs are two -fold including <br />$36,917 in increased tariff costs, as well as a $35,500 chassis cost increase. Therefore, if the city waits until 2026 <br />to purchase a replacement truck, the cost would increase to $719,741. <br />Staff is requesting City Council authorization tonight to advance the purchase of a replacement jetter-vacuum <br />combination truck from 2026 to 2025 to save a total of $72,417. <br />Notification: <br />N/A <br />Time Frame/Observations/Alternatives: <br />Staff estimate up to 15 minutes will be required to present and discuss this case. <br />Funding Source: <br />Per the attached pages from the adopted 2025 - 2034 CIP, the estimated cost to replace PW Unit #673 was <br />$850,000 and of this amount $200,000 was proposed to be funded through stormwater funds and $650,000 was <br />proposed to be funded through sanitary sewer funds. These funding sources receive revenue through user fees <br />and not general property tax levy. <br />Staff propose using a similar funding split recentrage for the replacement of PW Unit #673, no matter if the <br />purchase is made in 2025 at a cost of $647,324, or in 2026 at a cost of $719,741. <br />
The URL can be used to link to this page
Your browser does not support the video tag.