Laserfiche WebLink
4%FIE2se <br />www.ae2s.com <br />008 <br />Cityroved <br />Request <br />Groundbreaking <br />Signage <br />Reimbursement <br />$956.12 <br />Y <br />— <br />Cp ntingency Expense 2 <br />009 <br />Request <br />Prevailing Wages <br />$794,153.71 <br />Y <br />Change Order 01 <br />O10 <br />RFP 007 <br />Backwash Supply <br />Pipmg Modifications <br />$3,068.77 <br />y <br />Approved — <br />Construction Contingency Expense 3 <br />011 <br />Field Order <br />002 <br />Electrical <br />Modifications <br />$17,533.24 <br />Y <br />Approved — <br />Construction Contingency Expense 7 <br />011— <br />Part B <br />Engineer <br />Direction <br />Electrical <br />Modifications <br />$3,033.99 <br />y <br />Approved <br />Construction Contingency Expense 7 <br />012 <br />RFI 013 <br />Accordion Folding <br />Security Door <br />$10,010.85 <br />N <br />Approved — <br />Construction Contingency Expense 3 <br />013 <br />RFP 005 <br />Jet Mixing System <br />Pump Modifications <br />$16,834.33 <br />Y <br />Approved — <br />Construction Contingency Expense 3 <br />014 <br />RFP 009 <br />Backwash Tank <br />Overflow <br />$1,534.38 <br />y <br />Approved — <br />Construction Contingency Expense 3 <br />015 <br />Field Order <br />004 <br />Field Order No. 4 - <br />Door Hardware <br />Changes <br />$10,922.45 <br />Y <br />Approved — <br />Construction Contingency Expense 3 <br />016 <br />Door <br />Hardware <br />Meeting <br />Door Hardware <br />Changes <br />$56,724.85 <br />YConstruction <br />Approved — <br />Contingency Expense 3 <br />017 <br />RFP O10 <br />Filter Slab <br />Modifications <br />$96,634.23 <br />y <br />Approved — <br />Construction Contingency Expense 4 <br />018 <br />Field <br />Directed <br />Conduit Encasement <br />$5,389.13 <br />Y <br />Approved — <br />Construction Contingency Expense 4 <br />019 <br />Field Order <br />012 <br />North Sump Pit <br />$6,764.43 <br />y <br />Approved — <br />Construction Contingency Expense 5 <br />020 <br />Field Order <br />013 <br />CB1 Air Flow <br />Sleeves <br />$4,617.83 <br />Z' <br />Approved — <br />Construction Contingency Expense 5 <br />021 <br />RFP 013 <br />Torpedo Sand Filter <br />Layer <br />$27,979.43 <br />N <br />Approved — <br />Construction Contingency Expense 5 <br />022 <br />Remove Penetron <br />Admixture <br />- $5,920.00 <br />N <br />Approved — <br />Construction Contingency Expense 6 <br />023 <br />RFP 014 <br />Reservoir Vent <br />Piping <br />$3,645.52 <br />YConstruction <br />Approved — <br />Contingency Expense 6 <br />024 <br />RFP O15 <br />BWW Piping <br />Relocation <br />$5,504.74 <br />y <br />Approved — <br />Construction Contingency Expense 6 <br />025 <br />RFP 017 <br />Additional Waterstop <br />$10,749.95 <br />y <br />Approved — <br />Construction Contingency Expense 6 <br />026 <br />RFP 016 <br />Water Wick Drain <br />Connection <br />$3,144.81 <br />Z <br />Approved — <br />Construction Contingency Expense 6 <br />026 -p <br />Revised <br />RF 016 <br />Water Wick Drain <br />Connection <br />$5,948.79 (minus <br />the previously <br />approved amount <br />of $3,144.81) <br />Y <br />Approved — <br />Construction Contingency Expense 7 <br />027 <br />Field Order <br />019 <br />West Backwash 30" <br />Wall Detail <br />$8,567.47 <br />I' <br />Approved — <br />Construction Contingency Expense 7 <br />028 <br />Field Order <br />016 <br />Chemical <br />Containment <br />Modifications <br />$2,354.53 <br />YConstruction <br />Approved — <br />Contingency Expense 8 <br />029 <br />Field Order <br />018 <br />Fencing <br />Modifications <br />$3,769.36 <br />y <br />Approved — <br />Construction Contingency Expense 8 <br />030 <br />Submittal <br />128B <br />100 amp Breaker for <br />Mixing Pump <br />$3,743.56 <br />I, <br />Approved — <br />Construction Contingency Expense 8 <br />031 <br />RFP 018 <br />CU 3 Relocation <br />$21,596.32 <br />N <br />Approved — <br />Construction Contingency Expense 8 <br />Advanced Engineering and Environmental Services, Inc. <br />6901 East Fish Lake Road, Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />