• <br />• Action 1.4: Identify potential redevelopment properties <br />o Performance Indicator: Reduce blighted properties along Hwy 10 <br />o Completion Timeframe: Q4 2025 <br />Objective 3: Maintain/improve existing Park, Street and Trail conditions city wide <br />o Responsible Parties: Engineering, Public Works (Westby) <br />e—Key-A-rectsxisting-eemmer-c-ial-proper-t-ies-vis-ila <br />hie <br />• Action 2.1: Provide adequate current and future funding for PMP <br />• Action 2.2: Expand skim patching program to streets requiring reconstruction <br />beyond four y ars in the CIP <br />• Action 2.3: Provide routine maintenance of Parks <br />• Action 2.4: Provide routine maintenance of Trails per policy <br />o Performance Indicator: Improve PASER values <br />o Completion Timcframc: Ongoing <br />Commented [BH3]: Remove per direction at the 05/13 <br />Work Session I <br />• Objective 3: Rehabilitate Historic Townhall <br />o Responsible Parties: Economic Development (Sullivan, Hanson) <br />o Key Areas: Historic Townhall <br />• Action 2.1: Complete preliminary design of rehabilitation improvements <br />• Action 2.2: Apply for large grant opportunity <br />• Action 2.3: Apply for small grant opportunities if needed <br />• Action 2.4: Identify user/renter <br />o Performance Indicator: Acquire grant funds to fund remaining allowed construction <br />costs <br />o Completion Timeframe: Q1 2026 <br />Strategy 5. Improve the safety and mobility of transportation corridors <br />• Objective 1: Improve street lighting and pedestrian facilities <br />o Responsible Parties: Engineering, Public Works (Westby) <br />o Key Areas: Existing and future roadways and pedestrian facilities <br />• Action 1.1: Evaluate and construct street lighting improvements <br />• Action 1.2: Evaluate and construct pedestrian trail safety improvements <br />o Performance Indicator: Reduction in reported safety concerns <br />o Completion Timeframe: Ongoing <br />Strategy 6. Connect the community through parks, trails and recreational <br />programming <br />• Objective 1: Construct Phase 1 of The Waterfront Park <br />o Responsible Parties: Parks Division (Riverblood) <br />o Key Areas: COR Community Park and Downtown Destination <br />• Action 1.1: Approve schematic design work of water play area and future <br />community building June 10, 2025 <br />• Action 1.2: Authorize preparation of plans/specs August 12, 2025 <br />Formatted: Font Italic <br />11 <br />