My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/10/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 02/10/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 2:43:25 PM
Creation date
2/13/2026 1:45:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/10/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: <br />02/10/2026 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />5. 10. <br />Title: <br />Adopt Resolution #26-039 Approving Proposals for Engineering Design Services for 2026 Neighborhood <br />Pavement Overlay Improvements, Improvement Project #26-08 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #26-039 approving proposals for engineering design services for <br />2026 Neighborhood Pavement Overlay Improvements, Improvement Project #26-08. <br />Background: <br />The 2026 — 2035 Capital Improvement Plan (CIP) identifies mill and overlay of five (5) subdivisions within the <br />City. A street segment summary for the project is attached to this case. <br />Project History <br />• April 22, 2025, the Ramsey City Council adopted Resolution #25-082, accepting and awarding a proposal <br />to Hakanson Anderson for topographic survey and wetland delineation of the project area. <br />• May 13, 2025, the Ramsey City Council adopted Resolution #25-101, accepting and awarding a proposal <br />to Independent Testing Technologies for a geotechnical report of the project area. <br />• June 17, 025, the Ramsey Public Works Committee recommended City Council order plans and <br />specifications for said improvements. <br />• June 24, 2025, the Ramsey City Council adopted Resolution #25-125, ordering plans and specifications for <br />said improvements <br />• December 16, 2025, the Ramsey Public Works Committee recommended City Council order request for <br />proposals for said improvements. <br />• January 13, 2026, the Ramsey City Council adopted Resolution #26-011, ordering request for proposals for <br />engineering design services for said improvements. <br />Project Scope <br />This project proposes to mill and overlay four (4) subdivision within the City. <br />• Alpine Woods <br />• Evergreen Point Townhomes 1st & 2nd <br />• Hall -Anderson Acres (TH 47 Service Road only) <br />• Section 16 Unplatted <br />Riverside West (Ebony Street only) <br />Because of its proximity and small size, Riverside West (Ebony Street) is proposed to be added to the Riverside <br />West street reconstruction project (137th Avenue and Dolomite Street). <br />The updated project totals 1.39 miles in length, and is split between urban and rural sections. The project is not <br />proposing any repairs to watermain or sanitary sewer, minor storm sewer structure repairs typically consisting of <br />re -grouting catch basins is proposed. Additionally, any pedestrian ramps will be brought up to current ADA <br />compliance, the project area is estimated to include 24 pedestrian ramps. This will be further explored during <br />project design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.