My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/26/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 05/26/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 2:51:37 PM
Creation date
5/27/2026 8:48:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/26/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IP 27-01 MSA 142nd Avenue & Juniper Ridge Drive Reconstructions <br />This project proposes to reconstruct two (2) Municipal State Aid (MSA) street segments on the east side of <br />Ramsey; 142nd Avenue between Saint Francis Boulevard (TH 47) and Xkimo Street, and Juniper Ridge Drive <br />between 156th Lane and Roanoke Street. The segments were combined due to their relatively small size and close <br />proximity. 142nd Avenue is 0.07 miles of urban section including concrete curb and gutter, municipal water and <br />sewer, and storm sewer. Juniper Ridge Drive is 0.37 miles of urban section including bituminous curbing and <br />storm sewer inlets, but no municipal water and sewer. <br />These streets will be reconstructed to meet MSA 10-ton pavement design standards and minimum lane widths. <br />142nd Avenue is anticipated to be a full -depth reclamation (FDR). Juniper Ridge Drive is generally anticipated to <br />be an FDR with the addition of replacing the bituminous curbing with concrete curb and gutter. Because Juniper <br />Ridge Drive includes an outlet to the Rum River, staff will evaluate if a retro-fit hydrodynamic separator storm <br />structure would be appropriate. <br />Permitting will require review and approval by the MnDOT MSA office prior to bidding these improvements. <br />Staff will coordinate improvements at the intersection of 142nd Avenue and Saint Francis Boulevard (TH 47). <br />The current expectation is for MnDOT to overlay TH 47 and include the trail improvements between 142nd <br />Avenue and Xkimo Street. If trail improvements, including updated pedestrian ramps to current ADA standards is <br />required, staff will need to additionally work through a MnDOT right of way permit. <br />Juniper Ridge Drive is within the 2040 MUSA. The closest stub, located on Waco Street approximately 200 feet <br />south of Juniper Ridge Drive. This stub could service the immediate area, but does not have the depth to service <br />all of the project area. To date staff has not received inquires from residents, but could explore city service <br />extensions if given direction to from the committee. <br />The CIP level project costs are $539,784 ($469,377 MSA Funds, $70,407 Storm Water Utility Funds). <br />IP 27-02 2027 MSA Overlay Pavement Overlay Improvements <br />This project proposes to mill and overlay numerous MSA street segments within the south half of the COR, <br />totaling 1.61 miles in length. <br />• Rhinestone Street bituminous pavement between Veterans Drive and Bunker Lake Boulevard <br />• Sunwood Drive bituminous pavement between Armstrong Boulevard and Ramsey Boulevard <br />• Veterans Drive between Zeolite Street and Rhinestone Street <br />• Zeolite Street between Sunwood Drive and Veterans Drive <br />All of the street segments in this project are urban section including concrete curb and gutter, municipal sewer <br />and water, and storm sewer. The streets will need to meet MSA 10-ton pavement design standards and be marked <br />to meet MSA lane width standards as well. Staff will evaluate if pavement markings must be modified to meet <br />current standards, which will include the various turn lanes along Sunwood Drive that have been modified several <br />times due to past and current development. <br />In general, the improvements are proposed to include a 2-inch mill and overlay, with spot curb replacements and <br />ADA pedestrian ramp replacements. <br />The CIP level project costs are $785,169 ($747,780 MSA Funds, $37,389 Storm Water Utility Funds). <br />IP 27-03 Deerwood Street Reconstructions <br />This project proposes to reconstruct the streets within the Deerwood subdivision, generally located along Gibbon <br />Street and Eland Street, north of 173rd Avenue. The streets are 24-foot-wide rural section, totaling 1.13 miles in <br />length. Drainage is handled through street crossing culverts and drainage swales which generally carry storm <br />water to existing wetlands throughout the subdivision. <br />In 2016 significant time was spent reviewing the drainage of this subdivision, particularly around the possibility <br />
The URL can be used to link to this page
Your browser does not support the video tag.