My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/02/2002
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2002
>
Agenda - Planning Commission - 05/02/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:28:33 AM
Creation date
6/4/2003 12:12:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/02/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Outlets to the wetlands. <br />b. Overflow to the Rum River <br />c. Street grades <br />d. Horizontal and vertical curves <br />e. Drainage of north half of your development <br /> <br />The City has enacted an ordinance 'that requires an. elevation survey at the time of. footing <br />inspection to ensure compliance with the approved fma! grading plan. The grading plan shall <br />identify which type of house style (i.e. walkout, lbokout, rambler, etc) is permitted on each <br />lot. No gades shall be flatter than 1%. Grades flatter than 2¥0 will require a' certificate of <br />grading prior to an Occupancy.permit being granted. 'The requirement for an elevation,survey <br />on all footing inspections and. the requirement for a certificate of grading on lots with less <br />than a. 2% grade'shall be stated on the final grading plan. <br /> <br />The City of Ramsey does not'allow stormsewer pipe less than I5" unless it is for adead end <br />catch basin lead. All pipes under roads and parking areas must maintain a minimum of 2.5 <br />feet of cover over the top of the pipe. <br /> <br />The pond and outlet must be constructed and protected during Phase I and before any <br />building construction activity takes place. ' <br /> <br />A final grading plan must be submitted as part of the final plat] Items to be included on the <br />final grade plan are as follows: <br /> <br />a. Storm sewer size, type, inverts ant top of casting <br />b. Comer lot elevations <br />c. Critical drainage swale and emergency overflow elevations <br />d. Drainage and utility easements <br />e. House style with detail and table that includes house type, Iow floor elevation, garage <br /> floor elevation, lowest opening elevation, 100-year flood elevation, street center line <br /> elevations, and front and rear yard slopes. <br /> Detail of aprons (Class [II required) <br /> House elevations 100 foot error <br /> Palm elevation on Outlet control structure' detail is incorrect <br /> Detail of house style <br /> Coordination with Wildlife 2"d for storm sewer <br /> <br />Easements. The standard l0 foot drainage and utility easements (5 feet on common property <br />lines) have been provided around the perimeter of all tots except for Lot 2, Block 2, and Lot <br />3, Block 2. The preliminary plat shOuld be revised to include the 5 foot drainage and Utility <br />easement along the common boarder of Lots 2 and 3 of Block 2. Ail wetlands on the <br />property must be delineated and dedicated as drainage and utility easements. A 20 foot <br />easement is required over ali storm sewer pipes. <br /> <br />159 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.