Laserfiche WebLink
Assistant City Engineer Feriancek replied that those streets are not included in the ten-year CIP. <br />He commented that there are a fair number of neighborhoods that are past the point of an overlay, <br />but there is not sufficient funding to add them to the ten-year program. <br />Councilmember Olson arrived. <br />Chairperson Riley asked for information on a previous project on a proposed segment. <br />Assistant City Engineer Feriancek provided information on previous projects done in that area. <br />He provided information on the last project area and the anticipated open house that would be held. <br />He stated that staff would propose to bring a case forward to the City Council next Tuesday and <br />would then work on plans over the summer and the remainder of the year in order to open bids <br />during the winter or early spring. <br />City Engineer/Public Works Director Westby referenced the drainage discussion for Gibbons <br />Street. He commented that public information meetings are held for all street projects, and surveys <br />are sent to residents asking about any drainage issues or other concerns. <br />Motion by Councilmember Olson, seconded by Chairperson Specht, to recommend City Council <br />authorization to prepare plans and specifications for 2027 Pavement Management Program <br />projects. <br />Motion carried. Voting Yes: Chairperson Riley, Councilmembers Olson and Specht. Voting No: <br />None. <br />5.03: Consider Recommending to City Council Authorizing Well Siting Study Requests for <br />Proposals for Wells #9 and #10 <br />City Engineer/Public Works Director Westby reviewed the staff report and recommendation to <br />recommend City Council authorization to solicit Requests for Proposals for a Well Siting Study <br />for proposed municipal groundwater wells #9 and #10. <br />Councilmember Specht asked where Elk River wells draw water from. <br />City Engineer/Public Works Director Westby commented that Elk River is outside of the metro <br />and, therefore, is allowed to draw water from the Mount Simon aquifer. <br />Chairperson Riley acknowledged that well #2 is rarely used and asked if well #1 is used. <br />City Engineer/Public Works Director Westby replied that well #1 is used, but is not directly <br />connected to the water treatment plant. He stated that there is a CIP project to add a pressure filter <br />to treat the water at that location on its own, rather than connecting it to the plant. <br />Councilmember Olson recognized that the wells around the COR feed into the water treatment <br />plant and asked for confirmation that the wells outside the COR area do not feed into the plant. <br />Public Works Committee / May 19, 2026 <br />Page 3 of 5 <br />