Laserfiche WebLink
<br />Preliminary Plat and Preliminary Site Plan Review: Symphony At TO\\7J1 Center <br />April 26, 2007 <br />Page 4 of7 <br /> <br />plan complies with the development guidelines and provides green spaces for recreational <br />and stormwater management purposes on each block. <br /> <br />8. Grading and Drainage: Staff has received a grading and drainage plan for the revised <br />development plan and has the following comments. Stormwater calculations must be <br />submitted to the City and Lower Rum River Water Management Organization for verification <br />of conformance with the master drainage plan. The rock constm.ction entrance on the <br />Stormwater Pollution Prevention Program (SWPPP) must be supplemented with the City <br />requirement "Adjacent streets must be swept daily and as directed by the City during active <br />construction. The responsibility for the SWPPP on this site must be transferred to the new <br />owner and contractor prior to commencing construction. Provide a copy of the transfer. notice <br />to the City. <br /> <br />A SWPPP is required for tlns project. It must reference the SWPPP prepared for the Ramsey <br />Tovvn Center Project and provide for transfer of responsibility from RTC, LLC to this <br />developer and contractor. The master stormwater plan provides rate control for the entire <br />Ramsey Town Center Project. The plan requires application of Best Management Practices <br />(BMPs) on each site to enhance stormwater quality. The infiltration basins shown on the <br />plans will provide water quality treatment, however it appears only 30% of the site drains to <br />these devices, the remainder of the water discharges directly to the regional system. The <br />percentage of the site draining to a BMP must be increased by rerouting water to the <br />infiltration basins or by installing water quality treatment devices at each point where <br />stormwater leaves the site. <br /> <br />The maximum cross slope on driveways must be adjusted from 3% to 2.5%. Sapphire Way <br />must be revised to have a crown from 146th Avenue to 145th Place as well as all of 146th <br />Lane. Universal cross slope will be permitted on private drives between buildings, not on the <br />collector drives accessing the public streets. Silt fence must be shown on the enlarged <br />grading plans. Curb cuts draining to the Bioretention Facility must be replaced with a <br />structure and outlet pipe. The local soils are erode easily and curb cuts like these require <br />constant maintenance. <br /> <br />9. Utilities: This subdivision will be served by sanitary sewer and city water services that will <br />be extended into the development. The following specific comments must be addressed: <br /> <br />Ductile iron pipe 6" and smaller must be Class 53, 8" and larger is Class 52. Provide <br />specifications for the Ecostorm 1.5 device. Provide Ecostorm devices at STMH 101 and <br />CB:MH 117. <br /> <br />The applicable city details must be added to the sheets. Contact the Engineering department <br />for the latest details. <br /> <br />10. Tree Preservation. A tree preservation plan is not required as the site is void of trees. <br /> <br />22 <br />