<br />Preliminary Plat and Preliminary Site Plan Review: Symphony At Tov,/D. Center <br />April 26, 2007, Revised May 17,2007 <br />Page 5 of7 <br /> <br />and trail fees of $2475.00 per residential unit and trail development fees of $600.00 per unit. <br />The fees were meant to be taken care as agreed to in the Park and Trail Agreement dated April <br />28, 2005. The Master Developer is in default under that agreement. Prior to final plat and final <br />site plan, the obligations for this site must be met. Staffwill work with the Developer to explore <br />options on how this obligation will be met. <br /> <br />13. Traffic Generation: As part of the Town Center AUAR, a detailed traffic analysis was <br />completed that anticipated the type and size of development shown on the plat. The proposed <br />development is consistent with the traffic modeling system used as part of the AUAR <br />analysis. Regional road improvements to facilitate the whole Ramsey Town Center <br />development have been agreed upon and have already begun construction. This proposed <br />development does not generate more traffic than was anticipated. <br /> <br />14. Stormwater Trunk Fees: The Stormwater Trunk Fee was satisfied with the [mal plat and <br />recording of Ramsey Tovvn Center 7th Addition at the 2005 rate of$384/unit. The revision to <br />this development project is a net reduction in 4 units overall and a refund in the amount of <br />. $1,536.00 (4 units x $384.00) is due to the Developer. <br /> <br />15. Sewer and Water Trunk Fees: The Sewer and Water Trunk Fees were satisfied with the <br />final plat and recording of Ramsey Town Center 7th Addition at the 2005 rate of $2962/unit. <br />The revision to this development project is a net reduction in 4 units overall and a refund in <br />the amount of$II,848.00 (4 units x $2962) is due to the developer. <br /> <br />16. Ramsey Town Center Phase I Roadway Improvements, Phase II Roadway <br />Improvements, AUAR Roadway Improvements, Parking Facility Improvements: In <br />accordance with City of Ramsey Resolutions 05-02-065, 05-02-066, 05-02-067 and 05-02~ <br />068, assessments for Ramsey Town Center Phase I Roadway Improvements, Phase IT <br />Roadway Improvements, AUAR Roadway Improvements, and parking facility improvements <br />were satisfied with the final plat and recording of Ramsey Town Center 7th Addition. <br /> <br />17. Other Permits. The Developer is responsible for obtaining any and all permits required <br />from other regulatory agencies. <br /> <br />18. Townhouse Design/Architectural Standards: The development is proposing the same two <br />housing styles that were originally approved for Ramsey Town Center 7th Addition. The <br />housing products proposed remain in compliance with the Town Center architectural <br />standards. <br /> <br />19. Townhouse Size: City Code requires townhouse units to be a certain size based on the <br />number of bedrooms the unit will have: <br /> <br />1 bedroom <br />2 bedroom <br />3 bedroom <br /> <br /> <br />-137- <br />