My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 05/15/2007
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2000 - 2009
>
2007
>
Minutes - Public Works Committee - 05/15/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:54:25 PM
Creation date
6/26/2007 3:00:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
05/15/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Public Works Director Olson questioned how a contract would be administered in this fashion <br />and how they will proceed with properties where the owner states they would like a different <br />material after the work has been completed by the contractor. <br /> <br />Councilmember Dehen suggested the possibility of this being handled as a City function. They <br />may save money from not having the contractor doing this work and could have better relations <br />with the residents. <br /> <br />Councilmember Olson commented staff would need to be paid to do the work as well. <br /> <br />Public Works Director Olson indicated staff could not likely complete the work as quickly as the <br />contractor, and the City does not have the needed equipment. <br /> <br />Public Works Supervisor Reimer indicated there is a staff of five employees to work on streets. <br />Performing this work would significantly take away from work on potholes, signs, etc. He noted <br />there were 4 complaints out of274 properties regarding the Class 2 last year. <br /> <br />City Engineer Jankowski indicated in 2005, which was the first year this was done, there were <br />253 properties on 7 miles, with 4 or 5 complaints about the materials. <br /> <br />Public Works Director Olson explained this policy would only be for mral street sections. <br /> <br />Chairperson Elvig commented if the complaints are in the range of 4 out of 250 properties they <br />could go back with topsoil on these properties. <br /> <br />Councilmember Dehen stated he sees this as a problem on bends and intersections. He <br />questioned if there is a problem on straight away stretches. <br /> <br />Chairperson Elvig suggested a policy to use Class 2, 50 feet before and after corners and topsoil <br />on straight away stretches. <br /> <br />Public Works Director Olson explained there are occasions where the topsoil will wash away and <br />they will then end up with the same situation where someone overcorrects because they <br />accidentally went off the side. He questioned whether it is the City's liability if they do not have <br />the shouldering material there to withstand the weight of a vehicle, and whether it would be <br />better to error on the side of driver safety over aesthetics and put down Class 2. He noted if <br />someone wants to maintain their lawn they can take out the Class 2 and put in what they want. <br /> <br />Councilmember Dehen pointed out there is tort immunity for planning level decisions. He <br />would think it would be tough for the City to get sued on a planning level decision, which this <br />appears to be, balancing safety and aesthetics. He asked what the recommendation is of Mr. <br />Olson, and asked whether it would be difficult to administer a policy of putting down Class 2 in <br />the corners with topsoil in other areas. <br /> <br />Public Works Director Olson indicated a policy with Class 2 on intersections and curves could <br />be done. It would be better than making the decision property by property. However, they <br /> <br />Public Works Committee / May 15, 2007 <br />Page 8 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.