Laserfiche WebLink
<br />Option 1 <br />Improvements - Sanitary sewer, water, storm sewer and street restoration to be provided <br />in Area 1 only. Sidewalk would connect from The Meadows to CSAH 5. <br />Financing <br />· Area 1 to be assessed 100% of sanitary sewer, lateral watermain, trunk water and <br />sewer charges, storm sewer, the width of a 30 feet street restoration, and 50% of <br />sidewalk. <br />· City would contribute cost of addition street width beyond 32 feet, water trunk <br />costs, and 100% of the sidewalk. <br /> <br />Option 2 <br />Improvements - Sanitary sewer, water, storm sewer and street restoration to be provided <br />in Area 1, and street replacement is extended into Area 2. Sidewalk would connect from <br />The Meadows to CSAH 5. <br />Financing <br />· Area 1 to be assessed 100% of sanitary sewer, lateral watermain, trunk water and <br />sewer charges, storm sewer, and the width of a 32 feet street restoration. <br />· Area 2 would be assessed 50 % of the cost of street improvements which includes <br />storm sewer. <br />· City would contribute cost of additional street width beyond 32 feet, water trunk <br />costs, and 100% ofthe sidewalk. <br /> <br />Option 3 <br />Improvements - Sanitary sewer, water, storm sewer and street restoration and sidewalk to <br />be provided in Area 1, and sanitary sewer and water and street replacement and sidewalk <br />is extended into Area 2. <br />Financing <br />· Area 1 to be assessed 100% of sanitary sewer, lateral watermain, trunk water and <br />sewer charges, storm sewer, and the width of a 32 feet street restoration. <br />· Area 2 would be assessed 50 % of the cost of street improvements which includes <br />storm sewer. <br />· . City would contribute cost of additional street width beyond 30 feet, water trunk <br />costs; 100% of the lateral sanitary sewer and water in Area 2; and 100% ofthe <br />sidewalk <br /> <br />6 <br />