My WebLink
|
Help
|
About
|
Sign Out
Home
09/09/97
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1997
>
09/09/97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:09:28 AM
Creation date
6/25/2003 8:13:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
09/09/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steven Jankowski, P.E. - 2 - April 11, 1997 <br /> <br />e <br /> <br />e <br /> <br />Preliminary Layout <br /> <br />300 hours <br /> <br />· Develop horizontal alignment and geometrics for all roadways. <br /> <br />· Develop vertical alignments. <br /> <br />· Develop and compute roadway superelevation requirements. <br /> <br />· Design pavement section and develop typical sections. <br /> Perform preliminary drainage analysis. <br /> <br />· Prepare preliminary geometric layout and profiles as needed for Mn/DOT staff-approved <br /> (Level 2) layout in metric units. <br /> <br />· Submit layout and profiles to the City, County and Mn/DOT for comment. <br /> <br />· Meet with the City, County and Mn/DOT to review layout and profiles. <br /> <br />· Revise layout per comments and obtain Mn/DOT staff approval. <br /> <br />· Prepare copies of staff-approved layout and submit to Mn/DOT for distribution. <br /> <br />· Compute preliminary quantities and prepare preliminary Engineer's Estimate. <br /> <br />Project Memorandum (if necessary) <br /> <br />80 hours <br /> <br />· Prepare Project Memorandum as necessary to document potential for environmental <br /> impacts. <br /> <br />· Submit Project Memorandum for review by Mn/DOT and revise as necessary. <br /> <br />· Obtain Mn/DOT approval of Project Memorandum. <br /> <br />Public Information Meeting <br /> <br />8 hours <br /> <br />· Prepare for and attend one Public Information Meeting. <br /> <br />Update Signal Justification Reports <br /> <br />25 hours <br /> <br />Total Phase I <br /> <br />573 hours <br /> <br />Phase II- Final Plans, Specification and Estimate <br /> <br />1. Prepare Metric Unit Construction Plans <br /> <br />Format as necessary to meet Mn/DOT State Aid and Trunk Highway requirements. <br /> <br />· Plan content may include, but not be limited to the following: <br /> <br /> - Title sheet and general layout <br /> - Statement of estimated quantity sheets <br /> - Quantity tabulations as required <br /> - Earthwork estimate and summary <br /> <br />1,330 hours <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.