My WebLink
|
Help
|
About
|
Sign Out
Home
09/09/97
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1997
>
09/09/97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:09:28 AM
Creation date
6/25/2003 8:13:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
09/09/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steven Jankowski, P.E. - 3 - April 11, 1997 <br /> <br />e <br /> <br />- Staging and traffic control plans <br />- Construction details, soils notes and standard plates <br />- Erosion control plans <br />- Typical sections for all roadways <br />- Alignment data, including all coordinates, ties and azimuths <br />- Existing topography, utilities, and drainage features <br />- Proposed roadway curblines, tapers, radii, islands, bicycle trails, etc. <br />- Roadway profiles, groundlines, subcuts, superelevation and bench marks <br />- Storm sewer, culverts, and subsurface drainage plans and profiles <br />- Utility plans, including all sanitary sewer and water main work <br />- Turf establishment plans, including temporary erosion control <br />- Landscape plans <br />- Cross-section sheets <br />- Signal system plans <br />- Permanent signing and striping plan sheets <br /> <br />Submit plan to the City, County and Mn/DOT and make revisions as <br />approval. <br /> <br />necessary for <br /> <br />Engineer's Estimate <br /> <br />· Determine contract pay items and compute and check all contract quantities. <br /> quantities for cost splits and cost participation, as needed. <br /> <br />· Prepare Engineer's Estimate of Construction Costs <br /> <br />Contract Documents and Specifications <br /> <br /> 80 hours <br />Break out all <br /> <br />40 hours <br /> <br /> Develop contract special provisions as necessary. <br /> <br />· Develop Bid Documents. <br /> <br />· Assemble Contract Documents with special provisions and submit to the City and MWDOT <br /> for approval. <br /> <br />4. Permits 30 hours <br /> <br />· Prepare permit applications for City signature <br /> - Minnesota Pollution Control Agency - NPDES <br /> - Watershed District <br /> - Anoka County Highway Department <br /> - U.S. Corps of Engineers Section 404 <br /> - Minnesota Department of Natural Resources <br />· Wetland Conservation Act <br /> <br /> Right-of-Way and Easements <br /> <br />· Prepare legal descriptions <br /> right-of-way and easements <br /> <br />and drawings <br /> <br />as required to obtain all necessary <br /> <br />20 hours <br />permanent <br /> <br />Total Phase II 1,500 hours <br /> <br /> <br />